• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Water Science & Engineering
    • Volume 7, Issue 17
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Water Science & Engineering
    • Volume 7, Issue 17
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Integrated Evaluation of Increasing Irrigation Efficiency and Reducing Discharge Impacts on Hydropower Generation of Basin Water Resources System(Case Study: Dez Irrigation Network – Dez Dam)

    (ندگان)پدیدآور
    Navidi Nassaj, BehzadZohrabi, nargesShahbazi, Ali
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    998.9کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Original Article
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    World electricity production today is heavily dependent on water resources. Studies have shown that global warming and climate changes will have significant impacts on available water resources to produce hydroelectric power. Considering that the reservoir dam in the catchment area of Dez is simultaneously a producer of hydropower and supplier of water needed for agricultural land, the aim of this study is to estimate the quantitative effect of improving the efficiency of irrigation networks and reduce inputs to the dam on the amount of annual hydropower generation by the Dez dam power plant. For this purpose, with the integrated simulation of the Dez basin to Bandeghir, the effects of improving the efficiency of 5, 10, 15 and 20 percent, as well as decreasing the river inputs at 5 and 10 percent in two short- and long horizons, were studied. The results of this study showed that in the long run, as a result of the increased demand and the increase of hydraulic structures that are now at the justification stage, the amount of hydropower generation is reduced by about 115 GWh. The results showed that improving the efficiency can increase the amount of hydropower generation between 2 and 6 GWh per year. The production of hydroelectricity was highly dependent on the Dez River inputs, so that in the scenarios, a sudden drop in hydro-energy production occurred and the amount of it decreased by 5 and 10 percent, by 140 and 296 GWh, respectively.
    کلید واژگان
    Improvement Irrigation Efficiency
    reducing Inflow
    Hydropower Generation
    WEAP

    شماره نشریه
    17
    تاریخ نشر
    2017-10-01
    1396-07-09
    ناشر
    Islamic Azad University, Ahvaz Branch
    دانشگاه آزاد اسلامی واحد اهواز
    سازمان پدید آورنده
    PhD. Student, Department of Water Science and Engineering, Ahvaz Branch, Islamic Azad University, Ahvaz, Iran.
    Islamic Azad University Ahvaz
    Head of Water and Environment Modelling Center, Khuzestan Water and Power Authority, Ahvaz, Iran.

    شاپا
    2251-6905
    URI
    http://wsej.iauahvaz.ac.ir/article_540622.html
    https://iranjournals.nlai.ir/handle/123456789/61593

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب