نمایش مختصر رکورد

dc.contributor.authorNavidi Nassaj, Behzaden_US
dc.contributor.authorZohrabi, nargesen_US
dc.contributor.authorShahbazi, Alien_US
dc.date.accessioned1399-07-08T19:12:46Zfa_IR
dc.date.accessioned2020-09-29T19:12:46Z
dc.date.available1399-07-08T19:12:46Zfa_IR
dc.date.available2020-09-29T19:12:46Z
dc.date.issued2017-10-01en_US
dc.date.issued1396-07-09fa_IR
dc.date.submitted2017-09-09en_US
dc.date.submitted1396-06-18fa_IR
dc.identifier.citationNavidi Nassaj, Behzad, Zohrabi, narges, Shahbazi, Ali. (2017). Integrated Evaluation of Increasing Irrigation Efficiency and Reducing Discharge Impacts on Hydropower Generation of Basin Water Resources System(Case Study: Dez Irrigation Network – Dez Dam). Journal of Water Science & Engineering, 7(17), 23-40.en_US
dc.identifier.issn2251-6905
dc.identifier.urihttp://wsej.iauahvaz.ac.ir/article_540622.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/61593
dc.description.abstractWorld electricity production today is heavily dependent on water resources. Studies have shown that global warming and climate changes will have significant impacts on available water resources to produce hydroelectric power. Considering that the reservoir dam in the catchment area of Dez is simultaneously a producer of hydropower and supplier of water needed for agricultural land, the aim of this study is to estimate the quantitative effect of improving the efficiency of irrigation networks and reduce inputs to the dam on the amount of annual hydropower generation by the Dez dam power plant. For this purpose, with the integrated simulation of the Dez basin to Bandeghir, the effects of improving the efficiency of 5, 10, 15 and 20 percent, as well as decreasing the river inputs at 5 and 10 percent in two short- and long horizons, were studied. The results of this study showed that in the long run, as a result of the increased demand and the increase of hydraulic structures that are now at the justification stage, the amount of hydropower generation is reduced by about 115 GWh. The results showed that improving the efficiency can increase the amount of hydropower generation between 2 and 6 GWh per year. The production of hydroelectricity was highly dependent on the Dez River inputs, so that in the scenarios, a sudden drop in hydro-energy production occurred and the amount of it decreased by 5 and 10 percent, by 140 and 296 GWh, respectively.en_US
dc.format.extent998
dc.format.mimetypeapplication/pdf
dc.languageEnglish
dc.language.isoen_US
dc.publisherIslamic Azad University, Ahvaz Branchen_US
dc.publisherدانشگاه آزاد اسلامی واحد اهوازfa_IR
dc.relation.ispartofJournal of Water Science & Engineeringen_US
dc.relation.ispartofفصلنامه تخصصی علوم و مهندسی آبfa_IR
dc.subjectImprovement Irrigation Efficiencyen_US
dc.subjectreducing Inflowen_US
dc.subjectHydropower Generationen_US
dc.subjectWEAPen_US
dc.titleIntegrated Evaluation of Increasing Irrigation Efficiency and Reducing Discharge Impacts on Hydropower Generation of Basin Water Resources System(Case Study: Dez Irrigation Network – Dez Dam)en_US
dc.typeTexten_US
dc.typeOriginal Articleen_US
dc.contributor.departmentPhD. Student, Department of Water Science and Engineering, Ahvaz Branch, Islamic Azad University, Ahvaz, Iran.en_US
dc.contributor.departmentIslamic Azad University Ahvazen_US
dc.contributor.departmentHead of Water and Environment Modelling Center, Khuzestan Water and Power Authority, Ahvaz, Iran.en_US
dc.citation.volume7
dc.citation.issue17
dc.citation.spage23
dc.citation.epage40


فایل‌های این مورد

Thumbnail

این مورد در مجموعه‌های زیر وجود دارد:

نمایش مختصر رکورد