Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem
(ندگان)پدیدآور
Aryanezhad, Mir BahadorgholiKarimi-Nasab, MehdiFatemi Ghomi, Seyed Mohammad Taghiنوع مدرک
Textزبان مدرک
Englishچکیده
Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient model for a real case production planning problem. This process is reinforced by providing the proofs confirming the special characteristics of the final model such as proving its NP-Completeness. Also, the extremes of both objective functions – production smoothing versus cost minimizing – are calculated analytically. Finally, the case study and its solution methods are discussed briefly.
کلید واژگان
Multi-objectiveSingle machine
production planning
Multi-product
Multi-period
Controllable processing time
Pareto-optimal solutions
شماره نشریه
4تاریخ نشر
2009-09-011388-06-10
ناشر
QIAUسازمان پدید آورنده
Department of Industrial Engineering, Iran University of Science and Technology, Tehran, IranDepartment of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran
Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran
شاپا
2251-99042423-3935




