| dc.contributor.author | Aryanezhad, Mir Bahadorgholi | en_US |
| dc.contributor.author | Karimi-Nasab, Mehdi | en_US |
| dc.contributor.author | Fatemi Ghomi, Seyed Mohammad Taghi | en_US |
| dc.date.accessioned | 1399-07-08T19:02:31Z | fa_IR |
| dc.date.accessioned | 2020-09-29T19:02:31Z | |
| dc.date.available | 1399-07-08T19:02:31Z | fa_IR |
| dc.date.available | 2020-09-29T19:02:31Z | |
| dc.date.issued | 2009-09-01 | en_US |
| dc.date.issued | 1388-06-10 | fa_IR |
| dc.date.submitted | 2009-02-25 | en_US |
| dc.date.submitted | 1387-12-07 | fa_IR |
| dc.identifier.citation | Aryanezhad, Mir Bahadorgholi, Karimi-Nasab, Mehdi, Fatemi Ghomi, Seyed Mohammad Taghi. (2009). Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem. Journal of Optimization in Industrial Engineering, 2(4), 1-11. | en_US |
| dc.identifier.issn | 2251-9904 | |
| dc.identifier.issn | 2423-3935 | |
| dc.identifier.uri | http://www.qjie.ir/article_27.html | |
| dc.identifier.uri | https://iranjournals.nlai.ir/handle/123456789/57762 | |
| dc.description.abstract | Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient model for a real case production planning problem. This process is reinforced by providing the proofs confirming the special characteristics of the final model such as proving its NP-Completeness. Also, the extremes of both objective functions – production smoothing versus cost minimizing – are calculated analytically. Finally, the case study and its solution methods are discussed briefly. | en_US |
| dc.format.extent | 246 | |
| dc.format.mimetype | application/pdf | |
| dc.language | English | |
| dc.language.iso | en_US | |
| dc.publisher | QIAU | en_US |
| dc.relation.ispartof | Journal of Optimization in Industrial Engineering | en_US |
| dc.subject | Multi-objective | en_US |
| dc.subject | Single machine | en_US |
| dc.subject | production planning | en_US |
| dc.subject | Multi-product | en_US |
| dc.subject | Multi-period | en_US |
| dc.subject | Controllable processing time | en_US |
| dc.subject | Pareto-optimal solutions | en_US |
| dc.title | Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem | en_US |
| dc.type | Text | en_US |
| dc.contributor.department | Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran | en_US |
| dc.contributor.department | Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran | en_US |
| dc.contributor.department | Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran | en_US |
| dc.citation.volume | 2 | |
| dc.citation.issue | 4 | |
| dc.citation.spage | 1 | |
| dc.citation.epage | 11 | |