• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Journal of civil Engineering and Materials Application
      • Volume 3, Issue 1
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Journal of civil Engineering and Materials Application
      • Volume 3, Issue 1
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Reliability of T-stub Pre-stressed Connections Using Numerical Model

      (ندگان)پدیدآور
      Jafarkazemi, MahyarNemati, Armin
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      1.164 مگابایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      Original Article
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      In this paper, the reliability of T-stub pre-stressed connections is investigated using the numerical model. The T-stub connection is considered as a bolted one usually in the semi-rigid range. By selecting a test specimen, the T-stub bolted connection is initially simulated in the Abaqus finite element software to determine software validation and the modeling method used in this research. Then, the structural elements, loading, materials and type of analysis used in the test are introduced and 52 samples of T-stub connection controlled with construction and design constraints are determined to specify a series of targeted data through the changes in the geometric configuration and material strength of the T-stub connection elements. Finally, by performing nonlinear analyses in Abaqus finite element software and determining the limit state function of maximum tensile load of bolts in terms of random variables such as the bolt diameter, width and thickness of section flange, width and thickness of section at two performance levels, namely yielding and failure of web plate, the reliability is analyzed by Monte Carlo statistical method. The results of the probability of failure (PF) were zero for all samples under both performance levels. This is because the requirement for the failure mode not being occurred in the web of T-stub connection was observed when selecting the specimens. Therefore, the determined T-stub connection specimens are of strong bolted type and hence, the probability of failure (PF) becomes zero, which is the probability of the bolt being yielded in the unthreaded section after the web plate is yielded, and the failure of bolt in the threaded section after the failure of the web plate.
      کلید واژگان
      Reliability
      connections
      pre-stressed
      T-stub
      Numerical Model

      شماره نشریه
      1
      تاریخ نشر
      2019-03-01
      1397-12-10
      ناشر
      PenPub
      سازمان پدید آورنده
      Master of Civil Engineering, Hydraulic, Islamic Azad University of Roudhan Branch, Tehran, Iran.

      شاپا
      2676-232X
      2588-2880
      URI
      https://dx.doi.org/10.22034/jcema.2019.92023
      http://www.jcema.com/article_92023.html
      https://iranjournals.nlai.ir/handle/123456789/46753

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب