• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Industrial Engineering and Strategic Management
      • Volume 1, Issue 1
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Industrial Engineering and Strategic Management
      • Volume 1, Issue 1
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Simulation of Delay Factors in Sewage Projects with the Dynamic System Approach

      (ندگان)پدیدآور
      Monirabbasi, ArminRamezaniKhansari, AliMajidi, Leila
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      739.3کیلوبایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      Regular Article
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      Tehran sewerage company is one of the most important urban management organizations, which project control and delays in its projects is very important. In this regard, the main question of the magnitude and effect of delays, as well as the first step in controlling the delays of each project, is to identify the causes of the time lag of the project. In order to achieve this goal, the information and documentation of sewage networks of Iran - Tehran city (except for projects of main lines of sewage and refineries) has been used during 2011-2017. This study is a descriptive study (case study, survey and library) and the community studied by observers and contractors. For this purpose, all causes of delays in urban projects are identified and classified and the impact of each factor has been determined. Then, the variables have been evaluated using the method of dynamic system and Vensim software in order to influence of factors in the incidence of delays. As a result, the research shows that the total project delays are (respectively, the highest) in the first scenario (baseline) at the end of the 24 months (project completion period) for 140 days, in the fourth scenario for 126 days, in the third scenario for 83 days and in the second scenario for 53 days and the effect of changing the identified factors is examined. In fact, in the first scenario of the full duration work (24 months), a period of 4.7 months is project delays.
      کلید واژگان
      delays
      system dynamics
      Sewage Projects
      VENSIM
      model
      Methods and Techniques for Evaluating and Understanding Competitive

      شماره نشریه
      1
      تاریخ نشر
      2021-10-01
      1400-07-09
      ناشر
      Pouyan Press
      سازمان پدید آورنده
      Associate Professor, Department of Civil Engineering, Payame Noor University, Iran
      Master of Science (MSc) in Civil Engineering, Engineering and Construction Management, Payame Noor University, Iran
      Master of Science (MSc) in Civil Engineering, Earthquake, Iran University of Science and Technology , Iran

      URI
      https://dx.doi.org/10.22115/iesm.2020.232300.1006
      http://www.iesmj.com/article_114304.html
      https://iranjournals.nlai.ir/handle/123456789/41858

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب