نمایش مختصر رکورد

dc.contributor.authorMonirabbasi, Arminen_US
dc.contributor.authorRamezaniKhansari, Alien_US
dc.contributor.authorMajidi, Leilaen_US
dc.date.accessioned1399-07-08T18:20:41Zfa_IR
dc.date.accessioned2020-09-29T18:20:41Z
dc.date.available1399-07-08T18:20:41Zfa_IR
dc.date.available2020-09-29T18:20:41Z
dc.date.issued2021-10-01en_US
dc.date.issued1400-07-09fa_IR
dc.date.submitted2020-05-21en_US
dc.date.submitted1399-03-01fa_IR
dc.identifier.citationMonirabbasi, Armin, RamezaniKhansari, Ali, Majidi, Leila. (2021). Simulation of Delay Factors in Sewage Projects with the Dynamic System Approach. Industrial Engineering and Strategic Management, 1(1), 15-30. doi: 10.22115/iesm.2020.232300.1006en_US
dc.identifier.urihttps://dx.doi.org/10.22115/iesm.2020.232300.1006
dc.identifier.urihttp://www.iesmj.com/article_114304.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/41858
dc.description.abstractTehran sewerage company is one of the most important urban management organizations, which project control and delays in its projects is very important. In this regard, the main question of the magnitude and effect of delays, as well as the first step in controlling the delays of each project, is to identify the causes of the time lag of the project. In order to achieve this goal, the information and documentation of sewage networks of Iran - Tehran city (except for projects of main lines of sewage and refineries) has been used during 2011-2017. This study is a descriptive study (case study, survey and library) and the community studied by observers and contractors. For this purpose, all causes of delays in urban projects are identified and classified and the impact of each factor has been determined. Then, the variables have been evaluated using the method of dynamic system and Vensim software in order to influence of factors in the incidence of delays. As a result, the research shows that the total project delays are (respectively, the highest) in the first scenario (baseline) at the end of the 24 months (project completion period) for 140 days, in the fourth scenario for 126 days, in the third scenario for 83 days and in the second scenario for 53 days and the effect of changing the identified factors is examined. In fact, in the first scenario of the full duration work (24 months), a period of 4.7 months is project delays.en_US
dc.format.extent739
dc.format.mimetypeapplication/pdf
dc.languageEnglish
dc.language.isoen_US
dc.publisherPouyan Pressen_US
dc.relation.ispartofIndustrial Engineering and Strategic Managementen_US
dc.relation.isversionofhttps://dx.doi.org/10.22115/iesm.2020.232300.1006
dc.subjectdelaysen_US
dc.subjectsystem dynamicsen_US
dc.subjectSewage Projectsen_US
dc.subjectVENSIMen_US
dc.subjectmodelen_US
dc.subjectMethods and Techniques for Evaluating and Understanding Competitiveen_US
dc.titleSimulation of Delay Factors in Sewage Projects with the Dynamic System Approachen_US
dc.typeTexten_US
dc.typeRegular Articleen_US
dc.contributor.departmentAssociate Professor, Department of Civil Engineering, Payame Noor University, Iranen_US
dc.contributor.departmentMaster of Science (MSc) in Civil Engineering, Engineering and Construction Management, Payame Noor University, Iranen_US
dc.contributor.departmentMaster of Science (MSc) in Civil Engineering, Earthquake, Iran University of Science and Technology , Iranen_US
dc.citation.volume1
dc.citation.issue1
dc.citation.spage15
dc.citation.epage30


فایل‌های این مورد

Thumbnail

این مورد در مجموعه‌های زیر وجود دارد:

نمایش مختصر رکورد