• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Journal of Applied Research on Industrial Engineering
      • Volume 2, Issue 2
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Journal of Applied Research on Industrial Engineering
      • Volume 2, Issue 2
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      A Mathematical Model for the Single Machine Scheduling Considering Sequence Dependent Setup Costs and Idle Times

      (ندگان)پدیدآور
      Rafiei, AliHomayouni, Seyed MahdiShafiei Alavijeh, Amir
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      604.1کیلوبایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      Planning and scheduling are among the most important parts of the management's duties. Development of an efficient scheduling method can results in productivity improvement of an organization. Given the importance of production scheduling in an organization, this research seeks to propose a solution for one of the important problems for the production managers. This problem occurs if a considerable percentage of available production times is allocated to machine setup times. The objective of this research is to find a scheduling method to reach minimum of total production time, earliness and tardiness times. In previous researches not all effective factors on this scheduling method such as machine idle times and machine setup costs have been studied simultaneously. A mathematical model for the optimization of multi-product single-machine scheduling problem have been developed which considered sequence dependent setup costs, costs due to delay in delivery, holding costs, and costs related to machine idle time. Comparative results for the random small size test cases show that the proposed mathematical model can obtained an optimal solution in a relatively low computation time, however, for the large-scale cases this model is not efficient and an approximate method is required for these cases.
      کلید واژگان
      “Production Scheduling”
      “Sequence Dependent Setup Costs”
      “Tardiness”
      “Earliness”

      شماره نشریه
      2
      تاریخ نشر
      2015-06-01
      1394-03-11
      ناشر
      Ayandegan Institute of Higher Education, Iran
      سازمان پدید آورنده
      Department of Industrial Engineering, Najafabad Branch, Islamic Azad University, Isfahan, Iran
      Department of Industrial Engineering, Lenjan Branch, Islamic Azad University, Isfahan, Iran
      Department of Industrial Engineering, Lenjan Branch, Islamic Azad University, Isfahan, Iran

      شاپا
      2538-5100
      2676-6167
      URI
      http://www.journal-aprie.com/article_42683.html
      https://iranjournals.nlai.ir/handle/123456789/26974

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب