      Identifying and prioritizing of risks in electric industry development projects (Case study: transmission and high distribution of Khorasan Regional Electric Co.)

      (ندگان)پدیدآور
      Kolahan, FarhadRezayinik, EbrahimHassani Doughabadi, MarziyehRamezanpour, HamidTajadod, Amirreza
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      659.7کیلوبایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      Research Paper
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      Each year many large scale national projects face execution problems. In this regard, riskmanagement can play a significant role in identifying and taking proper measures. In this research,using Project Management Body of Knowledge (PMBOK), a risk management procedure has beendesigned and implemented in transmission and high distribution power lines of Khorasan RegionalElectric Company. First, using the results obtained from field studies and other information gatheringtools, different kinds of risks in transmission and high distribution power lines have been identified.Next, risks analysis have been carried out based on probability of occurrence, ease of detection,manageability as well as their impact on project goals. The rate of goals achievement was taken intoaccount by three criteria including time, cost and quality of execution. This followed by classificationof the risks, through risk breakdown structure, and then their prioritization. The results show thatbudget shortage, sanctions issues, improper selection of project team, have been the main risks in theprojects considered in this research. The proposed approach in this study, with minor modifications,may be employed to manage the risks in other large scale national projects.
      کلید واژگان
      Risk analysis and prioritization
      Project Management Body of Knowledge
      risk breakdown structure
      electricity production industry

      شماره نشریه
      1
      تاریخ نشر
      2015-04-01
      1394-01-12
      ناشر
      University of Tehran
      سازمان پدید آورنده
      Faculty of Engineering, Ferdowsi University of Mashhad, I.R. Iran
      Faculty of Industrial Engineering, Sadjad Institute of Higher Education, Mashhad, I.R. Iran
      Dept. of Industrial Engineering, Young Researchers Club, Islamic Azad University, Firoozkooh, I.R. Iran
      Faculty of Industrial Engineering, Sadjad Institute of Higher Education, Mashhad, I.R. Iran
      Khorasan Razavi Regional Electric Company, I.R. Iran

      شاپا
      2423-6896
      2423-6888
      URI
      https://dx.doi.org/10.22059/jieng.2015.54145
      https://jieng.ut.ac.ir/article_54145.html
      https://iranjournals.nlai.ir/handle/123456789/257541

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب