    Identifying and prioritizing of risks in electric industry development projects (Case study: transmission and high distribution of Khorasan Regional Electric Co.)

    (ندگان)پدیدآور
    Kolahan, FarhadRezayinik, EbrahimHassani Doughabadi, MarziyehRamezanpour, HamidTajadod, Amirreza
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    659.7کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Research Paper
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    Each year many large scale national projects face execution problems. In this regard, riskmanagement can play a significant role in identifying and taking proper measures. In this research,using Project Management Body of Knowledge (PMBOK), a risk management procedure has beendesigned and implemented in transmission and high distribution power lines of Khorasan RegionalElectric Company. First, using the results obtained from field studies and other information gatheringtools, different kinds of risks in transmission and high distribution power lines have been identified.Next, risks analysis have been carried out based on probability of occurrence, ease of detection,manageability as well as their impact on project goals. The rate of goals achievement was taken intoaccount by three criteria including time, cost and quality of execution. This followed by classificationof the risks, through risk breakdown structure, and then their prioritization. The results show thatbudget shortage, sanctions issues, improper selection of project team, have been the main risks in theprojects considered in this research. The proposed approach in this study, with minor modifications,may be employed to manage the risks in other large scale national projects.
    کلید واژگان
    Risk analysis and prioritization
    Project Management Body of Knowledge
    risk breakdown structure
    electricity production industry

    شماره نشریه
    1
    تاریخ نشر
    2015-04-01
    1394-01-12
    ناشر
    University of Tehran
    سازمان پدید آورنده
    Faculty of Engineering, Ferdowsi University of Mashhad, I.R. Iran
    Faculty of Industrial Engineering, Sadjad Institute of Higher Education, Mashhad, I.R. Iran
    Dept. of Industrial Engineering, Young Researchers Club, Islamic Azad University, Firoozkooh, I.R. Iran
    Faculty of Industrial Engineering, Sadjad Institute of Higher Education, Mashhad, I.R. Iran
    Khorasan Razavi Regional Electric Company, I.R. Iran

    شاپا
    2423-6896
    2423-6888
    URI
    https://dx.doi.org/10.22059/jieng.2015.54145
    https://jieng.ut.ac.ir/article_54145.html
    https://iranjournals.nlai.ir/handle/123456789/257541

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب