نمایش مختصر رکورد

dc.contributor.authorKolahan, Farhaden_US
dc.contributor.authorRezayinik, Ebrahimen_US
dc.contributor.authorHassani Doughabadi, Marziyehen_US
dc.contributor.authorRamezanpour, Hamiden_US
dc.contributor.authorTajadod, Amirrezaen_US
dc.date.accessioned1399-07-09T04:14:40Zfa_IR
dc.date.accessioned2020-09-30T04:14:40Z
dc.date.available1399-07-09T04:14:40Zfa_IR
dc.date.available2020-09-30T04:14:40Z
dc.date.issued2015-04-01en_US
dc.date.issued1394-01-12fa_IR
dc.date.submitted2014-06-07en_US
dc.date.submitted1393-03-17fa_IR
dc.identifier.citationKolahan, Farhad, Rezayinik, Ebrahim, Hassani Doughabadi, Marziyeh, Ramezanpour, Hamid, Tajadod, Amirreza. (2015). Identifying and prioritizing of risks in electric industry development projects (Case study: transmission and high distribution of Khorasan Regional Electric Co.). Advances in Industrial Engineering, 49(1), 107-116. doi: 10.22059/jieng.2015.54145en_US
dc.identifier.issn2423-6896
dc.identifier.issn2423-6888
dc.identifier.urihttps://dx.doi.org/10.22059/jieng.2015.54145
dc.identifier.urihttps://jieng.ut.ac.ir/article_54145.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/257541
dc.description.abstractEach year many large scale national projects face execution problems. In this regard, risk<br />management can play a significant role in identifying and taking proper measures. In this research,<br />using Project Management Body of Knowledge (PMBOK), a risk management procedure has been<br />designed and implemented in transmission and high distribution power lines of Khorasan Regional<br />Electric Company. First, using the results obtained from field studies and other information gathering<br />tools, different kinds of risks in transmission and high distribution power lines have been identified.<br />Next, risks analysis have been carried out based on probability of occurrence, ease of detection,<br />manageability as well as their impact on project goals. The rate of goals achievement was taken into<br />account by three criteria including time, cost and quality of execution. This followed by classification<br />of the risks, through risk breakdown structure, and then their prioritization. The results show that<br />budget shortage, sanctions issues, improper selection of project team, have been the main risks in the<br />projects considered in this research. The proposed approach in this study, with minor modifications,<br />may be employed to manage the risks in other large scale national projects.en_US
dc.format.extent659
dc.format.mimetypeapplication/pdf
dc.languageEnglish
dc.language.isoen_US
dc.publisherUniversity of Tehranen_US
dc.relation.ispartofAdvances in Industrial Engineeringen_US
dc.relation.isversionofhttps://dx.doi.org/10.22059/jieng.2015.54145
dc.subjectRisk analysis and prioritizationen_US
dc.subjectProject Management Body of Knowledgeen_US
dc.subjectrisk breakdown structureen_US
dc.subjectelectricity production industryen_US
dc.titleIdentifying and prioritizing of risks in electric industry development projects (Case study: transmission and high distribution of Khorasan Regional Electric Co.)en_US
dc.typeTexten_US
dc.typeResearch Paperen_US
dc.contributor.departmentFaculty of Engineering, Ferdowsi University of Mashhad, I.R. Iranen_US
dc.contributor.departmentFaculty of Industrial Engineering, Sadjad Institute of Higher Education, Mashhad, I.R. Iranen_US
dc.contributor.departmentDept. of Industrial Engineering, Young Researchers Club, Islamic Azad University, Firoozkooh, I.R. Iranen_US
dc.contributor.departmentFaculty of Industrial Engineering, Sadjad Institute of Higher Education, Mashhad, I.R. Iranen_US
dc.contributor.departmentKhorasan Razavi Regional Electric Company, I.R. Iranen_US
dc.citation.volume49
dc.citation.issue1
dc.citation.spage107
dc.citation.epage116