• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Industrial and Systems Engineering
    • Volume 11, Issue 2
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Industrial and Systems Engineering
    • Volume 11, Issue 2
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Optimal design of cross docking supply chain networks with time-varying uncertain demands

    (ندگان)پدیدآور
    Behnamian, JavadFatemi Ghomi, Seyed Mohammad TaghiJolai, FariborzTelgerdi, M.
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    193.5کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Research Paper
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    This paper proposes an integrated network design model for a post-distribution cross-docking strategy, comprising multi product production facilities with shared production resources, capacitated cross docks with setup cost and customer zones with time windows constraints. The model is dynamic in terms of time-varying uncertain demands, whereas uncertainty is expressed with scenario approach and contains both ‘‘wait-and-see'' and ‘‘here-and-now'' decisions. Inventory is just permitted in plants and over several time periods. The objective of the model is to minimize the sum of the fixed location costs for establishing cross docking centers and inventory related costs across the supply chain while ensuring that the limited service rate of cross docking centers and production facilities, and also the lead time requirements of customers are not violated. The problem is formulated as a mixed-integer linear programming problem and solved to global optimality using CPLEX. Due to the difficulty of obtaining the optimum solution in medium and large-scale problems, two heuristics that generate globally feasible, near optimal solution, Imperialistic competitive algorithm (ICA) and simulated annealing (SA), are also proposed as heuristics. We find that CPLEX is not able to solve some of the sets to optimality and turned out to run out of memory, but it performs quite well for small test sets, as compared with the two heuristics. While SA is a faster heuristic method in terms of runtime, ICA generates better results on average, but in more time.
    کلید واژگان
    Facilities planning and design
    cross-docking
    mixed integer model
    heuristics
    Facility Location
    Mathematical Modeling

    شماره نشریه
    2
    تاریخ نشر
    2018-04-01
    1397-01-12
    ناشر
    Iranian Institute of Industrial Engineering
    سازمان پدید آورنده
    Department of Industrial Engineering, Faculty of Engineering, Bu-Ali Sina University, Hamedan, Iran
    Department of Industrial Engineering,Amirkabir University of Technology,Tehran,Iran
    Department of Industrial Engineering,University of Tehran
    Department of Industrial Engineering,Amirkabir University of Technology, Tehran, Iran

    شاپا
    1735-8272
    URI
    http://www.jise.ir/article_57038.html
    https://iranjournals.nlai.ir/handle/123456789/252049

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب