مرور Volume 11, Issue 2 بر اساس تاریخ انتشار
در حال نمایش موارد 1 - 11 از 11
-
Self-Starting Control Chart and Post Signal Diagnostics for Monitoring Project Earned Value Management Indices
(Iranian Institute of Industrial Engineering, 2018-04-01)Earned value management (EVM) is a well-known approach in a project control system which uses some indices to track schedule and cost performance of a project. In this paper, a new statistical framework based on self-starting ...
-
A New Formulation for Cost-Sensitive Two Group Support Vector Machine with Multiple Error Rate
(Iranian Institute of Industrial Engineering, 2018-04-01)Support vector machine (SVM) is a popular classification technique which classifies data using a max-margin separator hyperplane. The normal vector and bias of the mentioned hyperplane is determined by solving a quadratic ...
-
Developing a fuzzy expert system to predict technology commercialization success
(Iranian Institute of Industrial Engineering, 2018-04-01)A majority of efforts in terms of technology commercialization have failed; however, the issue of commercialization and its high importance are agreed upon by policymakers, entrepreneurs and researchers. This shows the ...
-
Simultaneous reduction of emissions (CO2 and CO) and optimization of production routing problem in a closed-loop supply chain
(Iranian Institute of Industrial Engineering, 2018-04-01)Environmental pollution and emissions, along with the increasing production and distribution of goods, have placed the future of humanity at stake. Today, measures such as the extensive reduction in emissions, especially ...
-
An integrated heuristic method based on piecewise regression and cluster analysis for fluctuation data (A case study on health-care: Psoriasis patients)
(Iranian Institute of Industrial Engineering, 2018-04-01)Trend forecasting and proper understanding of the future changes is necessary for planning in health-care area.One of the problems of analytic methods is determination of the number and location of the breakpoints, especially ...
-
Multi-item inventory model with probabilistic demand function under permissible delay in payment and fuzzy-stochastic budget constraint: A signomial geometric programming method
(Iranian Institute of Industrial Engineering, 2018-04-01)This study proposes a new multi-item inventory model with hybrid cost parameters under a fuzzy-stochastic constraint and permissible delay in payment. The price and marketing expenditure dependent stochastic demand and the ...
-
A credit period contract towards coordination of pharmaceutical supply chain:The case of inventory-level-dependent demand
(Iranian Institute of Industrial Engineering, 2018-04-01)This paper considers a two stages pharmaceutical supply chain (PSC) consisting of a pharmaceutical manufacturer (pharma-manufacturer) that supplies one type of pharmaceutical product to a pharma-retailer. The customer ...
-
An Optimal Preventive Maintenance Model to Enhance Availability and Reliability of Flexible Manufacturing Systems
(Iranian Institute of Industrial Engineering, 2018-04-01)General preventive maintenance model for the components of a system, which improves the reliability to ‘as good as new,' was used to optimize the maintenance cost. The cost function of a maintenance ...
-
Equitable multi objective model for public facility location using RLTP technique
(Iranian Institute of Industrial Engineering, 2018-04-01)In the present research, a multi-objective model is proposed, which considers equity among the citizens in addition to the cost criterion. Then, the model will be solved using Reservation Level Tchebycheff Procedure (RLTP), ...
-
Optimal design of cross docking supply chain networks with time-varying uncertain demands
(Iranian Institute of Industrial Engineering, 2018-04-01)This paper proposes an integrated network design model for a post-distribution cross-docking strategy, comprising multi product production facilities with shared production resources, capacitated cross docks with setup ...
-
Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times
(Iranian Institute of Industrial Engineering, 2018-04-01)The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is ...



