• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Global Journal of Environmental Science and Management
      • Volume 4, Issue 3
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Global Journal of Environmental Science and Management
      • Volume 4, Issue 3
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      An occupational risk assessment approach for construction and operation period of wind turbines

      (ندگان)پدیدآور
      Gul, M.Guneri, A.F.Baskan, M.
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      994.0کیلوبایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      ORIGINAL RESEARCH PAPER
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      As wind energy is one of the most important renewable energy sources over the globe, need for increasing safety for this type of energy is gaining importance. Although this sector is not suffering an excessive amount of fatal injury accidents, there are many aspects open for improvements in occupational health and safety management. The construction and operation processes of wind turbines include several hazards that must be reduced. This study aims to present a risk assessment for the construction and operation period of wind tribunes using a new fuzzy based method. Fuzzy analytical hierarchy process, a common used multi criteria decision making method, is applied to assign weights to the parameters of Fine-Kinney risk analysis method. Then, fuzzy VIKOR method is used to prioritize hazards. A case study is carried out for an onshore wind turbine in Turkey by using occupational health and safety experts in weighting risk parameters and evaluating compromised rankings of the hazards. Results reveal the most important hazards both for construction and operation period of the wind tribune. On conclusion of the current study, control measures for those risks and possible corrective-preventive actions for improvement are also provided.
      کلید واژگان
      Fine-Kinney method
      Fuzzy analytic hierarchy process (FAHP)
      Fuzzy VIKOR (FVIKOR)
      Multi criteria decision making method (MCDM)
      Occupational health and safety (OHS)
      Risk Assessment
      Wind tribune
      Environmental risk assessment and management

      شماره نشریه
      3
      تاریخ نشر
      2018-07-01
      1397-04-10
      ناشر
      GJESM Publisher
      سازمان پدید آورنده
      Department of Industrial Engineering, Faculty of Engineering, Munzur University, 62000, Tunceli, Turkey
      Department of Industrial Engineering, Yildiz Technical University, 34349, Istanbul, Turkey
      Department of Industrial Engineering, Yildiz Technical University, 34349, Istanbul, Turkey

      شاپا
      2383-3572
      2383-3866
      URI
      https://dx.doi.org/10.22034/GJESM.2018.03.003
      https://www.gjesm.net/article_31241.html
      https://iranjournals.nlai.ir/handle/123456789/91985

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب