A New Analysis of Critical Paths in Mega Projects with Interval Type-2 Fuzzy Activities by Considering Time, Cost, Risk, Quality, and Safety Factors
(ندگان)پدیدآور
Dorfeshan, YahyaMousavi, Seyed MeysamVahdani, Behnamنوع مدرک
TextOriginal Manuscript
زبان مدرک
Englishچکیده
Critical path method (CPM) is categorized as a popular tool for scheduling mega projects. In this paper, to enjoy the advantages of interval type-2 fuzzy sets (IT2FSs) and better address uncertainty for the activities' attributes, a new analysis model is presented to determine the critical path under an IT2F-environment. Also, new efficient factors on specifying critical paths, such as time, cost, risk, safety, and quality (TCRSQ), are presented to achieve a more robust plan assisting in megaproject success. Moreover, an IT2F weighting approach is suggested for specifying the weights of TCRSQ factors. Furthermore, a new IT2F-approach employing the relative preference relation is expressed for identifying the importance of each expert. Consequently, a new model for critical path determination procedure by considering efficient factors is developed under the IT2FSs environment. Finally, to demonstrate the suggested model's capability and the calculation process, an application from the previous research is solved.
کلید واژگان
Analysis of critical pathsmegaprojects
interval type-2 fuzzy sets (IT2FSs)
risk, quality, and safety factors
شماره نشریه
1تاریخ نشر
2022-03-011400-12-10
ناشر
QIAUسازمان پدید آورنده
Department of Industrial Engineering, Faculty of Engineering, Shahed University, Tehran, IranDepartment of Industrial Engineering, Faculty of Engineering, Shahed University, Tehran, Iran
Department of Industrial Engineering and Mechanical Engineering, Islamic Azad University, Qazvin Branch, Qazvin, Iran
شاپا
2251-99042423-3935