A Theoretical Detailed Analysis for a Proposed 5kW PV Grid-Connected System Installed in Iraq Using PVsyst Tool
(ندگان)پدیدآور
Abbood Al-Khazzar, A. A.نوع مدرک
TextOriginal Article
زبان مدرک
Englishچکیده
In this study, PVsyst simulation software is used to analyze a PV grid tied system in a typical primary school in Iraq. The proposed system is 5kW which is affordable and applicable from the cost and required area points respectively. The monthly averaged electrical load for a typical school is approximately calculated. The system simulation has been done for thirteen Iraqi provinces while it is described and its performance is analyzed in details for Baghdad city as an example. The performance ratio for the system in Baghdad is 0.825 and about 9.82MWhr is generated by the system per year, 62.7% is consumed by the load and the remaining is injected to the national grid. The results showed that the initial capital cost is 5,442$ which is returned after five and a half years. The cost of 1 kWhr if the system operates for 10 years is 0.058$. This study clearly demonstrates that photovoltaic power system can effectively assist the peak load on the grid. In addition, these systems are very economical/no maintenance project and can be hooked to any the peak time load.
کلید واژگان
Solar energyPhotovoltaic system
Grid-tied systems
Simulation
Iraq
PVsyst
شماره نشریه
2تاریخ نشر
2018-06-011397-03-11
ناشر
Babol Noshirvani University of Technologyسازمان پدید آورنده
Independent Researcher, Former Lecturer at University of Baghdad, College of Engineering, Energy Engineering Department, Baghdad, Iraqشاپا
2079-21152079-2123