    Risk Assessment of Bridge Construction Project through cost management phases

    (ندگان)پدیدآور
    Ali, AbdulelahAl-Ablani, BaderMekky, MarwaAl-Ghimlas, NouraAlam, Mohd
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    388.2کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Original Article
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    Risk assessment is an important factor in project cost management. This study addresses the risks associated with a 900 meter long bridge construction project. The risk of a bridge construction project is assessed to limit and quantify the impact on the project. The impact of various risks was investigated to express the impact on the total project contract value at the estimation stage. A project risk analysis is introduced to assess the percentage of risk attributed to the total cost. After assessing the impact of risks on cost using Expected Monetary Value (EMV), a new approach of including uncertainties on risk analyses, using description (C, Q, K), is discussed and its advantages and shortcomings are highlighted. Risk is then assessed at several stages of project execution during the budgeting phase, and risk-based project value (RPV) is used to assess the value of the project at each stage. RPV usually increases as the project progresses towards its goals. Due to this property, the RPV of the entire project can be categorized into the contribution value (CV) of each activity. The CV of an activity is defined as the increase in RPV after each activity completes successfully. The results highlight the positive impact of successfully completing the activities associated with the highest risk. In addition, practical solutions for risk assessment and analysis of bridge construction projects are provided for use by bridge construction contractors, project managers and project management engineers.
    کلید واژگان
    Expected monetary value (EMV)
    uncertainty (C, Q, K) description
    contribution value (CV)

    شماره نشریه
    1
    تاریخ نشر
    2021-03-01
    1399-12-11
    ناشر
    Islamic Azad University, South Tehran Branch
    سازمان پدید آورنده
    Department of Industrial Engineering, Jazan University, Jazan 45142, Saudi Arabia
    Mechanical Engineering Department, Faculty of Engineering, Benha University, Cairo, Egypt
    Department of Mechanical Design and Production Engineering, Cairo University, Giza, Egypt
    Department of Quantitative Methods and Information Systems, College of Business Administration, Kuwait University, Kuwait
    Department of Mechanical Engineering, Vivekananda Global University, Jaipur, Rajasthan

    شاپا
    1735-5702
    2251-712X
    URI
    https://dx.doi.org/10.30495/jiei.2021.1922802.1098
    http://jiei.azad.ac.ir/article_684106.html
    https://iranjournals.nlai.ir/handle/123456789/842652

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب