      A COMPARATIVE MODEL OF EVM AND PROJECT’S SCHEDULE RISK ANALYSIS USING MONTE CARLO SIMULATION

      (ندگان)پدیدآور
      Mojabi, BaharRadfar, RezaNazemi, Jamshid
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      6.485 مگابایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      Research Paper
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      The issue of successful project management and control is of vital importance in today's world. Although the time and cost of any project is determined in advance, paying less attention to an appropriate control and revision will result in a small chance of reaching those goals. The earned value management method that shows deviation of projects schedules and costs is of the good method for this problem however, it does not consider risks and uncertainties. Risk is defined as uncertainty of projects from internal and external environment. Identification and analysis of these risks with an appropriate and effective method is important. As regards conditions that risk imposes on project, the project will be deviated through its life cycle and managers should try to reduce deviations using corrective actions. However risk analysis is widely used in projects today, but this risk analysis is highly futuristic. The purpose of this research is designing a comparative model of earned value management and project schedule risk analysis that uses best corrective actions to improve the condition of the project. In this paper, earned value management indicators are calculated and analyzed and project completion time and delay factors are obtained by using a real project data. Also the project completion time and delay are investigated using project risk analysis and estimating activities completion time by doing Monte Carlo simulations. Finally by comparison of these two methods, a solution is proposed to improve the project condition.

      شماره نشریه
      2
      تاریخ نشر
      2013-06-01
      1392-03-11
      ناشر
      Islamic Azad University E-Branch
      سازمان پدید آورنده
      M.A. Graduated of IT Management, Science & Research Branch, Islamic Azad University, Tehran, Iran
      Associated Prof. of Industrial Management, Science & Research Branch, Islamic Azad University, Tehran, Iran
      Faculty Member of Engineering Department, Science & Research Branch, Islamic Azad University, Tehran, Iran

      شاپا
      2251-9335
      2252-0279
      URI
      http://www.ijissm.org/article_553745.html
      https://iranjournals.nlai.ir/handle/123456789/80791

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب