نمایش مختصر رکورد

dc.contributor.authorDelgoshaei, Aidinen_US
dc.contributor.authorAli, Ahaden_US
dc.contributor.authorParvin, Masihen_US
dc.contributor.authorGhoreishi, Maryamen_US
dc.date.accessioned1399-07-08T19:59:40Zfa_IR
dc.date.accessioned2020-09-29T19:59:40Z
dc.date.available1399-07-08T19:59:40Zfa_IR
dc.date.available2020-09-29T19:59:40Z
dc.date.issued2018-11-01en_US
dc.date.issued1397-08-10fa_IR
dc.date.submitted2018-10-09en_US
dc.date.submitted1397-07-17fa_IR
dc.identifier.citationDelgoshaei, Aidin, Ali, Ahad, Parvin, Masih, Ghoreishi, Maryam. (2018). An Applicable Heuristic for Scheduling Multi-mode Resource Constraint Projects Using PERT Technique in the Presence of Uncertain Duration of Activities. International Journal of Supply and Operations Management, 5(4), 338-360. doi: 10.22034/2018.4.4en_US
dc.identifier.urihttps://dx.doi.org/10.22034/2018.4.4
dc.identifier.urihttp://www.ijsom.com/article_2770.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/78857
dc.description.abstractIn project planning process, resource over-allocation is a major shortcoming. The resource over-allocation causes the schedules not to be applicable in practice. Besides, in real projects, it is hard to predict the duration of activities since they may be changed due to lack of resources, delays in delivering resources, improper workers etc. that cause activities not to complete as predicted. Hence, it is important to develop a method that can schedule activities by considering different execution conditions. In this research, we focused on another aspect of solving resource over-allocation problem by considering uncertain activity duration. For this purpose, a mixed integer programming model is developed where the objective function is maximizing net present value of the project while duration of activities are not deterministic. Then a number of examples are solved using a heuristic algorithm. The results showed that the proposed algorithm can effectively solve the case studies with no over-allocated resources. Afterward, the algorithm is solved using the data of constructing a hospital. The results showed that the algorithm can successfully use for real projects.en_US
dc.format.extent2145
dc.format.mimetypeapplication/pdf
dc.languageEnglish
dc.language.isoen_US
dc.publisherKharazmi Universityen_US
dc.relation.ispartofInternational Journal of Supply and Operations Managementen_US
dc.relation.isversionofhttps://dx.doi.org/10.22034/2018.4.4
dc.subjectMulti-mode resource constrainten_US
dc.subjectHeuristicen_US
dc.subjectActivity duration uncertaintyen_US
dc.subjectResource over-allocationen_US
dc.subjectproject managementen_US
dc.titleAn Applicable Heuristic for Scheduling Multi-mode Resource Constraint Projects Using PERT Technique in the Presence of Uncertain Duration of Activitiesen_US
dc.typeTexten_US
dc.typeResearch Paperen_US
dc.contributor.departmentDepartment of Industrial Engineering, Faculty of Engineering, Kharazmi University, Tehran, Iran and Faculty of Engineering, university of Putra Malaysia, Serdang, Kuala Lumpur, Malaysiaen_US
dc.contributor.departmentDepartment of Mechanical Engineering, Lawrence Technological University, Southfield, Michigan, USAen_US
dc.contributor.departmentFaculty of Engineering, university of Putra Malaysia, Serdang, Kuala Lumpur, Malaysiaen_US
dc.contributor.departmentDepartment of Economics and Business, BSS, Aarhus University, Aarhus, Denmarken_US
dc.citation.volume5
dc.citation.issue4
dc.citation.spage338
dc.citation.epage360