    A Multi-Objectives Weighting Genetic Algorithm for Scheduling Resource-Constraint Project Problem in the Presence of Resource Uncertainty

    (ندگان)پدیدآور
    Delgoshaei, AidinAram, AisaMantegh, VahidHanjani, SepehrNasiri, Amir HosseinShirmohamdi, Fatemeh
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    2.002 مگابایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Research Paper
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    Scarce resources may cause delay in completion of a project on time. In this research, a multi-objective decision making model is developed for scheduling multi-mode resource constraint scheduling problem in the presence of uncertain resources. The objectives are profit, execution cost and completion time. To develop this idea, a multi-objective non-linear mixed integer programming model is developed where resource availability is not deterministic and expressed by triangular probability function. In continue a multi-objective weighting genetic algorithm is proposed (MOWGA) which is flexible enough to be used in real projects. To verify the performance of the proposed method, a number of experiments are solved and results are analyzed. The outcomes, indicated that while resource uncertainty increases, higher complexity in schedules is observed. It is also found that optimizing one objective function is not necessarily resulted in optimizing the others. The MOWGA is then successfully applied for a project with real data.
    کلید واژگان
    Project Planning
    Multi-Mode Scheduling
    Multi-Objective Weighting Genetic Algorithm
    project management

    شماره نشریه
    3
    تاریخ نشر
    2019-08-01
    1398-05-10
    ناشر
    Kharazmi University
    سازمان پدید آورنده
    Department of Mechanical and Manufacturing Engineering, Faculty of Engineering, University of Putra, Serdang, Malaysia
    Department of Mechanical and Manufacturing Engineering, Faculty of Engineering, University of Putra, Serdang, Malaysia
    Department of Mechanical and Manufacturing Engineering, Faculty of Engineering, University of Putra, Serdang, Malaysia
    Department of Mechanical and Manufacturing Engineering, Faculty of Engineering, University of Putra, Serdang, Malaysia
    Department of Mechanical and Manufacturing Engineering, Faculty of Engineering, University of Putra, Serdang, Malaysia
    Department of Mechanical and Manufacturing Engineering, Faculty of Engineering, University of Putra, Serdang, Malaysia

    URI
    https://dx.doi.org/10.22034/2019.3.3
    http://www.ijsom.com/article_2791.html
    https://iranjournals.nlai.ir/handle/123456789/78814

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب