• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • International Journal of Supply and Operations Management
      • Volume 4, Issue 2
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • International Journal of Supply and Operations Management
      • Volume 4, Issue 2
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Modeling the Multi-period and Multi-product Closed-loop Supply Chain Network Design Problem Considering Reused Cost and Capacity Constraints

      (ندگان)پدیدآور
      derakhshan, aliHosseini, Seyyed Mohammad HassanHasani, Ali Akbar
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      1.525 مگابایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      Research Paper
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      The importance of remanufacturing used products into new ones has been widely recognized in the literature and in practice. This is due to both of economic opportunities and environmental aspects. This paper aims to design a new integrated multi-period & multi-product closed-loop supply chain network considering reused cost and capacity constraints for all stages. In this problem the stages of supplier, assembler, retailer, customer, collection center, refurbishing center, and disassembler is regarded consequently. The considered objective function is total cost factors that consists of 7 components: costs of associated with locating the plants and retailers, purchasing, transportation, collection of used products from customers, disposal for subassemblies, refurbishing, and finally refund to customers. First, parameters and decision variables of this problem are defined, then a mixed integer linear programming mathematical model is presented. The proposed mathematical model is run applying the GAMS software. Two real examples (shed light, and power-outlet) are considered to solve using the proposed mathematical model. These two examples were obtained based on data in two new references. Since this problem is known as NP-Hard, the model is run just for small-sized problem consists of four suppliers, two disassemblers, two retailers, and two periods. The results are analysed and some sensitivity analysis have been done for the effective factors. These result show that, the demand has a less effect on total cost. But Purchasing/refurbishing cost ratio has a high effect on the objective function. Finally, the capacity of collection and refurbishing centers has a high effect in primary changes and this effect gradually reduced. So having the proper capacity for collection and refurbishing centers and also creating balance between different stages can reduce overall cost.
      کلید واژگان
      Capacity constraints
      Closed-loop supply chains
      Reused costs
      optimization in supply chain management

      شماره نشریه
      2
      تاریخ نشر
      2017-05-01
      1396-02-11
      ناشر
      Kharazmi University
      سازمان پدید آورنده
      Department of industrial engineering and management, Shahrood university of technology, Shahrood, Iran
      Department of industrial engineering and management, Shahrood university of technology, Shahrood, Iran
      Department of industrial engineering and management, Shahrood university of technology, Shahrood, Iran

      URI
      https://dx.doi.org/10.22034/2017.2.03
      http://www.ijsom.com/article_2727.html
      https://iranjournals.nlai.ir/handle/123456789/78786

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب