• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • International Journal of Supply and Operations Management
      • Volume 4, Issue 1
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • International Journal of Supply and Operations Management
      • Volume 4, Issue 1
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Modeling and solving the distributed and flexible job shop scheduling problem with WIPs supply planning and bounded processing times

      (ندگان)پدیدآور
      Ziaee, M.
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      1.118 مگابایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      Research Paper
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      In this paper, for the first time in the literature, we integrated production scheduling decisions and WIPs planning decisions in a distributed environment. We study the distributed and flexible job shop scheduling problem (DFJSP) which involves the scheduling of jobs (products) in a distributed manufacturing environment, under the assumption that the shop floor of each factory/cell is configured as a flexible job shop. It is also assumed that the work-in-process (WIP) parts can be bought from the market instead of manufacturing them in-house, and they also can be sold in the market instead of processing their remaining operations and selling the end products. Moreover, the processing times of the operations can be decreased by paying a cost. However, there are a lower limit and an upper limit for the processing time of each operation. We formulate this general problem as a mixed integer linear programming (MILP) model. A fast heuristic algorithm is also developed to obtain good solutions in very short time. The algorithm is tested on some problem instances in order to evaluate its performance. Computational results show that the proposed heuristic is a computationally efficient and practical approach.
      کلید واژگان
      Distributed scheduling
      WIPs supply planning
      Flexible job shop
      Bounded processing times
      operations planning,scheduling & control

      شماره نشریه
      1
      تاریخ نشر
      2016-02-01
      1394-11-12
      ناشر
      Kharazmi University
      سازمان پدید آورنده
      University of Bojnord, Bojnord, Iran

      URI
      https://dx.doi.org/10.22034/2017.1.06
      http://www.ijsom.com/article_2722.html
      https://iranjournals.nlai.ir/handle/123456789/78754

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب