• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • The ISC International Journal of Information Security
      • Volume 11, Issue 3
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • The ISC International Journal of Information Security
      • Volume 11, Issue 3
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Towards Measuring the Project Management Process During Large Scale Software System Implementation Phase

      (ندگان)پدیدآور
      Aljedaibi, WajdiKhamis, Sufian
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      853.7کیلوبایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      ORIGINAL RESEARCH PAPER
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      Project management is an important factor to accomplish the decision to implement large-scale software systems (LSS) in a successful manner. The effective project management comes into play to plan, coordinate and control such a complex project. Project management factor has been argued as one of the important Critical Success Factor (CSF), which need to be measured and monitored carefully during the implementation of Enterprise Resource Planning(ERP) systems. The goal of this article is to develop âA CSF-Live!âAI which is a method for measuring, monitoring, and controlling critical success factors of large-scale software systems. To achieve such goal, we apply CSF-Live for the project management CSF. The CSF-Live uses the Goal/Question/Metric paradigm (GQM) to yield a flexible framework containing several metrics that we used it to develop a formulation to enable the measurement of the project management CSF. The formulation that we developed for the project management CSF implies that the significance of having proper project management when conducting an ERP system implementation, since it is positively associated with the success of the ERP.
      کلید واژگان
      Enterprise Resource Planning Systems (ERPs)
      Critical Success Factors (CSF)
      Measurement
      Goal/Question/Metric paradigm (GQM)
      Software Project Management

      شماره نشریه
      3
      تاریخ نشر
      2019-08-01
      1398-05-10
      ناشر
      Iranian Society of Cryptology
      سازمان پدید آورنده
      Department of Computer Science, Faculty of Computing and Information technology, King Abdulaziz University, Jeddah, Saudi Arabia
      Deanship of Information Technology, King Abdulaziz University, Jeddah, Saudi Arabia

      شاپا
      2008-2045
      2008-3076
      URI
      https://dx.doi.org/10.22042/isecure.2019.11.0.21
      http://www.isecure-journal.com/article_90895.html
      https://iranjournals.nlai.ir/handle/123456789/73459

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب