      Modified multi-objective PSO for coordination of directional overcurrent relays in interconnected networks

      (ندگان)پدیدآور
      Mahboubkhah, AfshinTalavat, VahidBeiraghi, Mojtaba
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      1.541 مگابایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      Original Article
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      Directional overcurrent relays are used to protect transmission lines against short circuits. Reducing the total operating time of relays has always been a challenge for protection engineers. For this purpose, various optimization algorithms have been introduced, some of which are based on multi-objective optimization. The objective functions of multi-objective algorithms must have the Pareto optimality property, which it's ignoring is one of the drawbacks of previous studies. In this paper, new objective functions are proposed for a multi-objective optimization problem. To solve the optimization problem, the Multi-object PSO (MOPSO)algorithm is applied with small but effective changes to get the fastest settings of relays. These changes include a leader selection method, a removal method of repository surplus members, and a new velocity vector for particles based on the value of the objective function in the previous iteration. The proposed algorithm is evaluated in IEEE 30-bus network and compared with the standard MOPSO. There is also a comparison with the recent outstanding papers. The proposed method, compared to the 15 algorithms of other papers, results in the lowest total operating time of relays with a 7% reduction.
      کلید واژگان
      MOPSO
      optimization
      Pareto-ranking
      IEEE 30-bus network
      Optimization of energy systems

      شماره نشریه
      1
      تاریخ نشر
      2021-03-01
      1399-12-11
      ناشر
      Iran Energy Association (IEA)
      سازمان پدید آورنده
      Department of Electrical Engineering, Urmia Branch, Islamic Azad University, Urmia, Iran
      Department of Electrical Engineering, Urmia Branch, Islamic Azad University, Urmia, Iran
      Department of Electrical Engineering, Urmia Branch, Islamic Azad University, Urmia, Iran

      شاپا
      2588-3372
      URI
      https://dx.doi.org/10.22109/jemt.2020.232092.1242
      http://www.jemat.org/article_111160.html
      https://iranjournals.nlai.ir/handle/123456789/68258

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب