• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Journal of Optimization in Industrial Engineering
      • Volume 10, Issue 21
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Journal of Optimization in Industrial Engineering
      • Volume 10, Issue 21
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms

      (ندگان)پدیدآور
      Hasanpour, JavadGhodoosi, MohammadHosseini, Zahra Sadat
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      2.103 مگابایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      Original Manuscript
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategies. We also introduce the preemptive extension of the problem which allows activity splitting. In this paper the preemption multi-mode resource-constrained project scheduling problem (P-MMRCPSP) with Minimum makespan and the maximization of net present value (NPV) has been considered. Since the considered model is NP-Hard, The performance of our proposed model is evaluated by comparison with two well-known algorithms; non-dominated sorting genetic algorithm (NSGA II), multi-objective imperialist competitive algorithm (MOICA). These metaheuristics have been compared on the basis of a computational experiment performed on a set of instances obtained from standard test problems constructed by the ProGen project generator, where, additionally, cash flows were generated randomly with the uniform distribution. Since the effectiveness of most meta-heuristic algorithms significantly depends on choosing the proper parameters. A Taguchi experimental design method (DOE) was applied to set and estimate the proper values of GAs parameters for improving their performances. The computational results show that the proposed MOICA outperforms the NSGA-II.
      کلید واژگان
      Multi-objective Project Scheduling
      Resource Constraint
      Preemptive
      Net Present Value
      Meta-heuristic Algorithm
      Scheduling

      شماره نشریه
      21
      تاریخ نشر
      2017-03-01
      1395-12-11
      ناشر
      QIAU
      سازمان پدید آورنده
      Msc, Department of industrial Engineering, Quchan University of Advanced Technology, Quchan, Iran
      Msc, Department of industrial Engineering, University of Torbat Heydarieh, Torbat Heydarieh, Iran
      PhD Student of Industrial Engineering, Yazd University ,Yazd, Iran

      شاپا
      2251-9904
      2423-3935
      URI
      https://dx.doi.org/10.22094/joie.2016.263
      http://www.qjie.ir/article_263.html
      https://iranjournals.nlai.ir/handle/123456789/57909

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب