      Fuzzy Multi-Objective Linear Programming for Project Management Decision under Uncertain Environment with AHP Based Weighted Average Method

      (ندگان)پدیدآور
      Hossain, Md. SanowarMahmud, ShahedHossain, Md. Mosharraf
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      4.808 مگابایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      Original Manuscript
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      Smooth implementation and controlling conflicting goals of a project with the usage of all related resources through organization is inherently a complex task to management. At the same time deterministic models are never efficient in practical project management (PM) decision problems because the related parameters are frequently fuzzy in nature. The project execution time is a major concern of the involved stakeholders (client, contractors and consultants). For optimization of total project cost through time control, here crashing cost is considered as a critical factor in project management. The proposed approach aims to formulate a multi objective linear programming model to simultaneously minimize total project cost, completion time and crashing cost with reference to direct, indirect cost in the framework of the satisfaction level of decision maker with fuzzy goal and fuzzy cost coefficients.. To make such problems realistic, triangular fuzzy numbers and the concept of minimum accepted level method are employed to formulate the problem. The proposed model leads decision makers to choose the desired compromise solution under different risk levels and the project optimization problems have been solved under multiple uncertainty conditions. The Analytical Hierarchy Process is used to rank multiple objectives to make the problem realistic for the respective case. Here minimum operator and AHP based weighted average operator method is used to solved the model and the solution is obtained by using LINGO software
      کلید واژگان
      Project Management
      Multi-objective linear programming
      Minimum operator
      Analytical Hierarchy Process
      Scheduling

      شماره نشریه
      20
      تاریخ نشر
      2016-09-01
      1395-06-11
      ناشر
      QIAU
      سازمان پدید آورنده
      Department of Industrial & Production Engineering, Rajshahi University of Engineering & Technology.
      Assistant Professor, Department of Industrial and Production Engineering, Rajshahi University of Engineering and Technology, Bangladesh
      Professor, Department of Industrial and Production Engineering, Rajshahi University of Engineering and Technology, Bangladesh

      شاپا
      2251-9904
      2423-3935
      URI
      https://dx.doi.org/10.22094/joie.2016.250
      http://www.qjie.ir/article_250.html
      https://iranjournals.nlai.ir/handle/123456789/57896

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب