    A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

    (ندگان)پدیدآور
    Nader Abadi, SedighehRoghanian, EmadAghassi, Hadi
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    460.6کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mode are also allocated and the highest quantities of these resources are limited. In the MRCTCT, the goal is to reduce the total project cost with respect to the resource restrictions .The gene value is encoded as the mode index which is selected from among modes of the activity randomly. For indicating construction mode of the activity, integer encoding is applied instead of binary encoding. Additionally, the selection of genes for mutation is based on chromosome value, as solution convergence rate is high. The crossover operator of GA is based on a two-point method. This paper also offers a multi-attribute fitness function for the problem. This function can vary by decision maker (DM) preferences (time or cost). In this paper, a two-phase algorithm is proposed in which both the effects of time-cost trade-off and resource-constrained allocation are taken into account. A GA-based time-cost trade-off analysis is improved for choosing the execution mode of every activity through the trade-off of time and cost, followed by proposing a resource constrained allocation algorithm to generate an optimum schedule without overriding the project constraints. Lastly, the model is verified by means of a case study and a real project.
    کلید واژگان
    A multi-mode resource constrained
    Project Scheduling
    Time-cost trade-off
    Resource constrained allocation
    Multi- attribute fitness function

    شماره نشریه
    8
    تاریخ نشر
    2011-06-01
    1390-03-11
    ناشر
    QIAU
    سازمان پدید آورنده
    Msc, Department of Industrial Engineering, Arak Branch, Islamic Azad university, Arak, Iran
    Assistant Professor, Department of Industrial Engineering, K.N.Toosi University of Technology, tehran, Iran
    instructor, Department of computer Engineering, Iran University of Science and Technology, tehran, Iran

    شاپا
    2251-9904
    2423-3935
    URI
    http://www.qjie.ir/article_87.html
    https://iranjournals.nlai.ir/handle/123456789/57799

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب