• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Journal of Optimization in Industrial Engineering
      • Volume 4, Issue 8
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Journal of Optimization in Industrial Engineering
      • Volume 4, Issue 8
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

      (ندگان)پدیدآور
      Nader Abadi, SedighehRoghanian, EmadAghassi, Hadi
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      460.6کیلوبایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mode are also allocated and the highest quantities of these resources are limited. In the MRCTCT, the goal is to reduce the total project cost with respect to the resource restrictions .The gene value is encoded as the mode index which is selected from among modes of the activity randomly. For indicating construction mode of the activity, integer encoding is applied instead of binary encoding. Additionally, the selection of genes for mutation is based on chromosome value, as solution convergence rate is high. The crossover operator of GA is based on a two-point method. This paper also offers a multi-attribute fitness function for the problem. This function can vary by decision maker (DM) preferences (time or cost). In this paper, a two-phase algorithm is proposed in which both the effects of time-cost trade-off and resource-constrained allocation are taken into account. A GA-based time-cost trade-off analysis is improved for choosing the execution mode of every activity through the trade-off of time and cost, followed by proposing a resource constrained allocation algorithm to generate an optimum schedule without overriding the project constraints. Lastly, the model is verified by means of a case study and a real project.
      کلید واژگان
      A multi-mode resource constrained
      Project Scheduling
      Time-cost trade-off
      Resource constrained allocation
      Multi- attribute fitness function

      شماره نشریه
      8
      تاریخ نشر
      2011-06-01
      1390-03-11
      ناشر
      QIAU
      سازمان پدید آورنده
      Msc, Department of Industrial Engineering, Arak Branch, Islamic Azad university, Arak, Iran
      Assistant Professor, Department of Industrial Engineering, K.N.Toosi University of Technology, tehran, Iran
      instructor, Department of computer Engineering, Iran University of Science and Technology, tehran, Iran

      شاپا
      2251-9904
      2423-3935
      URI
      http://www.qjie.ir/article_87.html
      https://iranjournals.nlai.ir/handle/123456789/57799

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب