      The Investigation of Effective Factors in the Removal of Bentonite Jelly from the Joints of Cut-off Wall Panels

      (ندگان)پدیدآور
      Mir Mohammad Hosseini, Seyed MajdeddinAzadmaneshb, Abdolhossein
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      526.7کیلوبایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      In the construction process of a plastic concrete cut-off wall, concreting is usually performed using the termie pipe method. In this method, concreting is performed from the lowest point in the excavated trench (containing the slurry) using a funnel and the pipe connected to it. The concrete poured in the funnel gradually settles in the panel through the termie pipe which is beneath the slurry and the end of the pipe has always been in the concrete. Because of its unit weight which is less than that of the concrete, the slurry goes up and the height of its column reduces. As the construction continues the length of the termie pipe is cut down so that the remaining operation is carried out more easily. In this process there are three types of flows to be considered: concrete flow in the termie pipe, concrete flow in the panel and slurry flow in the panel. Using the fundamentals of hydraulics, this paper tries to study the interactions among these fluids. It also examines the influential factors in removing the bentonite jelly in order to provide the plastic concrete with homogeneity and consistency (slump 22-16 cm) in primary and secondary panels of cut – off wall as a most reliable water tightening system in most dam foundations.
      کلید واژگان
      Plastic concrete
      Cut-off-Wall
      Primary Panel
      Secondary Panel
      Bentonite Jelly

      شماره نشریه
      1
      تاریخ نشر
      2015-03-01
      1393-12-10
      ناشر
      Civil Engineering & Construction Research Center (CCRC), QIAU
      سازمان پدید آورنده
      Prof. Amirkabir Univ. of Technology, Tehran- Iran
      b. sc. Civil Eng. Mahab Ghodss Consulting Eng. Co., Tehran- Iran

      شاپا
      2476-5465
      URI
      http://www.qjseg.ir/article_747.html
      https://iranjournals.nlai.ir/handle/123456789/46474

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب