    Competitive distribution system planning model integration of DG, interruptible load and voltage regulator devices

    (ندگان)پدیدآور
    پدیدآور نامشخص
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    443.9کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    Distribution systems management is becoming an increasingly complicated issue due to the introduction of new technologies, new energy trading strategies, and new deregulated environment. In the new deregulated energy market and considering the incentives coming from the technical and economical fields, it is reasonable to consider Distributed Generation (DG) as a viable option to solve the lacking electric power supply problem. This paper presents a mathematical distribution system planning model considering three planning options to system expansion and to meet the load growth requirements with a reasonable price as well as the system power quality problems. DG is introduced as an attractive planning option in competition with voltage regulator devices and Interruptible load. In the mathematical model, the objective function includes investment costs, which are evaluated as annualized total cost, plus the total running cost as well as the cost of curtailed loads and losses. This model identifies the optimal type, size, and location of the planning options. This paper also studies the fluctuation of the load and electricity market price versus time period, and the effect of DG placement on system improvement. To solve the proposed mathematical planning model a new software package by interfacing MATLAB and GAMS is developed. This package enables one to solve large extent distribution system planning program visually and very fast. The proposed methodology is tested on the case of the well-known IEEE 30-bus test system.
    کلید واژگان
    deregulation
    distributed generation (DG)
    distribution company (DISCO)
    GAMS-MATLAB interface
    interruptible load (IL)
    Optimization

    شماره نشریه
    6
    تاریخ نشر
    2010-12-01
    1389-09-10
    ناشر
    Shiraz University

    شاپا
    2228-6179
    URI
    https://dx.doi.org/10.22099/ijste.2010.829
    http://ijste.shirazu.ac.ir/article_829.html
    https://iranjournals.nlai.ir/handle/123456789/45365

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب