• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • International Journal of Supply and Operations Management
      • Volume 7, Issue 3
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • International Journal of Supply and Operations Management
      • Volume 7, Issue 3
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      An Integrated Bi-objective Build-to-order Supply Chain and Maintenance under Uncertainties: A Case Study

      (ندگان)پدیدآور
      Ebrahimi, MaliheTavakkoli-Moghaddam, Reza
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      1.272 مگابایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      Research Paper
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      Nowadays, by increasing competition and customization, a build-to-order (BTO) system is given more consideration. Because of receiving the order at the beginning of assembling in BTO systems, the time of a failed machine causes a longer lead time. Thus, preventive maintenance (PM) can increase the availability of machines and is useful in this system. It is under the constant interval, in which the Weibull's graph is used to estimate a Weibull distribution for a failure rate function. This paper aims to maximize the total available time of machines, which is calculated based on the sum of the time of stopping the machines. In other words, the time of stopping the machines is maximized. This paper develops a new integrated bi-objective BTO supply chain problem, which maximizes the profit and minimizes the time of stopping the machines by PM. Maintenance is a new issue in BTO studies. Since the importance of on-time lead time in these systems, PM has beneficial results in these systems, which is very useful for senior managers. Outsourcing and pricing are the other issues considered in this paper. Furthermore, a robust optimization approach is applied to handle uncertainty. The new robust BTO supply chain model is performed in a wood industry to accredit this proposed model. At last, managerial insights are provided in such a way that using PM, outsourcing, pricing, and uncertainty in BTO systems is very useful and applicable.
      کلید واژگان
      Build-to-order
      Supply chain
      Preventive maintenance
      Robust optimization

      شماره نشریه
      3
      تاریخ نشر
      2020-08-01
      1399-05-11
      ناشر
      Kharazmi University
      سازمان پدید آورنده
      School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
      School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran

      URI
      https://dx.doi.org/10.22034/IJSOM.2020.3.4
      http://www.ijsom.com/article_2819.html
      https://iranjournals.nlai.ir/handle/123456789/435255

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب