    An ex ante control chart for project monitoring using earned duration management observations

    (ندگان)پدیدآور
    Hossein Mortaji, Seyed TahaNoori, SiamakNoorossana, RassoulBagherpour, Morteza
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    1.020 مگابایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project's performance indicators, by plotting them on the Shewhart-type control charts over time. However, these control charts are fundamentally designed for processes and ignore project-specific dynamics, which can lead to weak results and misleading interpretations. By paying close attention to the project baseline schedule and using statistical foundations, this paper proposes a new ex ante control chart which discriminates between acceptable (as-planned) and non-acceptable (not-as-planned) variations of the project's schedule performance. Such control chart enables project managers to set more realistic thresholds leading to a better decision making for taking corrective and/or preventive actions. For the sake of clarity, an illustrative example has been presented to show how the ex ante control chart is constructed in practice. Furthermore, an experimental investigation has been set up to analyze the performance of the proposed control chart. As expected, the results confirm that, when a project starts to deflect significantly from the project's baseline schedule, the ex ante control chart shows a respectable ability to detect and report right signals while avoiding false alarms.
    کلید واژگان
    Earned duration management . Ex ante control chart . Duration performance index . Control limits . Project monitoring

    شماره نشریه
    4
    تاریخ نشر
    2018-12-01
    1397-09-10
    ناشر
    Islamic Azad University, South Tehran Branch
    سازمان پدید آورنده
    Department of Industrial Engineering, Iran University of Science and Technology, Narmak, Tehran, Iran
    Department of Industrial Engineering, Iran University of Science and Technology, Narmak, Tehran, Iran
    Department of Industrial Engineering, Iran University of Science and Technology, Narmak, Tehran, Iran
    Department of Industrial Engineering, Iran University of Science and Technology, Narmak, Tehran, Iran

    شاپا
    1735-5702
    2251-712X
    URI
    http://jiei.azad.ac.ir/article_676830.html
    https://iranjournals.nlai.ir/handle/123456789/434613

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب