• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Industrial Engineering, International
    • Volume 14, Issue 3
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Journal of Industrial Engineering, International
    • Volume 14, Issue 3
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Developing a cellular manufacturing model considering the alternative routes, tool assignment, and machine reliability

    (ندگان)پدیدآور
    Sadat Khorasgani, Sayyed MahdiGhaffari, Mahdi
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    445.4کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    The cell formation (CF) is one of the most important steps in the design of a cellular manufacturing system (CMS), which it includes machines’ grouping in cells and part grouping as separate families, so that the costs are minimized. The various aspects of the problem should be considered in a CF. The machine reliability and the tool assigned to them are the most important problems which have to be modeled correctly. Another important aspect in CMS is material handling costs that they consist of inter-cell and intra-cell movement costs. Moreover, setup and tool replacement costs can be effective in CF decision making. It is obvious that CF cannot be completed without considering the number of demand. With considering of all of the above aspects, an extended linear integer programming is represented for solving the cell formation problem (CFP) in this study. The objective is to minimize the sum of inter-cell movement, intra-cell movement, tool replacement, machine breakdown, and setup costs. In the other terms, for states that cost of movement is higher than tool-changing cost, although a part can have the inter- and/or intra-cell movements, the model tries to find a solution which part is allocated to one cell and with changing the tools, processes of that part is completed. In addition, to validate the model and show its efficiency and performance, several examples are solved by branch and bound (B&B) method.
    کلید واژگان
    Cell formation problem Material handling
    costs Alternative processing routes Tool assignment
    Machine reliability Branch and bound

    شماره نشریه
    3
    تاریخ نشر
    2018-09-01
    1397-06-10
    ناشر
    Islamic Azad University, South Tehran Branch
    سازمان پدید آورنده
    Department of Industrial Engineering, Naragh Branch, Islamic Azad University, Naragh, Iran
    Department of Industrial Engineering, Naragh Branch, Islamic Azad University, Naragh, Iran

    شاپا
    1735-5702
    2251-712X
    URI
    http://jiei.azad.ac.ir/article_676806.html
    https://iranjournals.nlai.ir/handle/123456789/434602

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب