• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Journal of Industrial Engineering, International
      • Volume 14, Issue 1
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Journal of Industrial Engineering, International
      • Volume 14, Issue 1
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      An enhanced reliability-oriented workforce planning model for process industry using combined fuzzy goal programming and differential evolution approach

      (ندگان)پدیدآور
      Ighravwe, D. E.Oke, S. A.. Adebiyi, K. A
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      982.6کیلوبایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      This paper draws on the “human reliability" concept as a structure for gaining insight into the maintenance workforce assessment in a process industry. Human reliability hinges on developing the reliability of humans to a threshold that guides the maintenance workforce to execute accurate decisions within the limits of resources and time allocations. This concept offers a worthwhile point of deviation to encompass three elegant adjustments to literature model in terms of maintenance time, workforce performance and return-on-workforce investments. These fully explain the results of our influence. The presented structure breaks new grounds in maintenance workforce theory and practice from a number of perspectives. First, we have successfully implemented fuzzy goal programming (FGP) and differential evolution (DE) techniques for the solution of optimisation problem in maintenance of a process plant for the first time. The results obtained in this work showed better quality of solution from the DE algorithm compared with those of genetic algorithm and particle swarm optimisation algorithm, thus expressing superiority of the proposed procedure over them. Second, the analytical discourse, which was framed on stochastic theory, focusing on specific application to a process plant in Nigeria is a novelty. The work provides more insights into maintenance workforce planning during overhaul rework and overtime maintenance activities in manufacturing systems and demonstrated capacity in generating substantially helpful information for practice
      کلید واژگان
      Returns
      workforce investment . Fuzzy goalprogramming . Meta
      heuristics . Maintenance workforce planning . Manufacturing system

      شماره نشریه
      1
      تاریخ نشر
      2018-03-01
      1396-12-10
      ناشر
      Islamic Azad University, South Tehran Branch
      سازمان پدید آورنده
      Department of Mechanical Engineering, Faculty of Engineering, University of Lagos, Room 10, Mezzanine Complex, Akoka-Yaba, Lagos, Nigeria
      Department of Mechanical Engineering, Faculty of Engineering, University of Lagos, Room 10, Mezzanine Complex, Akoka-Yaba, Lagos, Nigeria
      Department of Mechanical Engineering, Faculty of Engineering and Technology, Ladoke Akintola University of Technology, Ogbomoso, Nigeria

      شاپا
      1735-5702
      2251-712X
      URI
      http://jiei.azad.ac.ir/article_676749.html
      https://iranjournals.nlai.ir/handle/123456789/434573

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب