Pareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times
(ندگان)پدیدآور
Rezaeian Zeidi, J.Zarei, M.Shokoufi, K.نوع مدرک
Textزبان مدرک
Englishچکیده
This paper addresses an unrelated multi-machine scheduling problem with sequence-dependent setup time, release date and processing set restriction to minimize the sum of weighted earliness/tardiness penalties and the sum of completion times, which is known to be NP-hard. A Mixed Integer Programming (MIP) model is proposed to formulate the considered multi-criteria problem. Also, to solve the model for real-sized applications, a Pareto-based algorithm, namely controlled elitism non-dominated sorting genetic algorithm (CENSGA), is proposed. To validate its performance, the algorithm is examined under six performance metric measures, and compared with a Pareto-based algorithm, namely NSGA-II. The results are statistically evaluated by the Mann–Whitney test and t-test methods. From the obtained results based on the t-test, the proposed CENSGA significantly outperforms the NSGA-II in four out of six terms. Additionally, the statistical results from Mann–Whitney test show that the performance of the proposed CENSGA is better than the NSGA- II in two out of six terms. Finally, the experimental results indicate the effectiveness of the proposed algorithm for different problems.
کلید واژگان
multiobjective optimization
Unrelated parallel machine
just
time Scheduling
Controlled elitism non
dominated sorting genetic algorithm
mixed integer programming
Sequence
dependent setup time
شماره نشریه
12تاریخ نشر
2017-12-011396-09-10
ناشر
Materials and Energy Research Centerسازمان پدید آورنده
Department of Industrial Engineering, Mazandaran University of Science and Technology, Babol, IranDepartment of Industrial Engineering, Mazandaran University of Science and Technology, Babol, Iran
Department of Industrial Engineering, Mazandaran University of Science and Technology, Babol, Iran
شاپا
1025-24951735-9244




