• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • International Journal of Engineering
    • Volume 33, Issue 7
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • International Journal of Engineering
    • Volume 33, Issue 7
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Identifying Tools and Methods for Risk Identification and Assessment in Construction Supply Chain

    (ندگان)پدیدآور
    Hernadewita, H.Saleh, B. I.
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    696.6کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Original Article
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    The construction project is a business full of risk in every process due to its complexity, changes, and involvement from various stakeholders. One of the critical risks in the construction project is in the supply chain. Identifying and assessing the risk with the right tools and methods in that area will inevitably affect the success of the project. Unfortunately, the research for the tools and methods in a construction supply chain is still limited and scattered. This research objective is to analyze the gap between literature and to create improvement in tools and methods for risk identification and assessment in the construction supply chain. This research will use the systematic literature review method in finding and investigating the tools and methods. The four methods that were found are: Analytical Hierical Process (AHP), Failure Mode Effect Analysis (FMEA), Supply Chain Operation Reference (SCOR), and Hazard and  Operational (HAZOP). Strength and weakness with their potential use as tools and methods for identifying and assessing the construction supply chain risk then summarized. The use of  SCOR  combined with  FMEA  methods has shown to be practical tools and methods for identifying and assessing the construction supply chain risk.
    کلید واژگان
    Construction Supply Chain
    Risk identification and assessment method
    Analytical Hierical Process
    Hazard and Operational
    Failure Mode Effect Analysis
    Supply Chain Operation Reference

    شماره نشریه
    7
    تاریخ نشر
    2020-07-01
    1399-04-11
    ناشر
    Materials and Energy Research Center
    سازمان پدید آورنده
    Industrial Engineering, Mercu Buana University, Jakarta, Indonesia
    Industrial Engineering, Mercu Buana University, Jakarta, Indonesia

    شاپا
    1025-2495
    1735-9244
    URI
    https://dx.doi.org/10.5829/ije.2020.33.07a.18
    http://www.ije.ir/article_108450.html
    https://iranjournals.nlai.ir/handle/123456789/337416

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب