Solving Re-entrant No-wait Flow Shop Scheduling Problem
(ندگان)پدیدآور
Amin Naseri, M.R.Tasouji Hassanpour, SaeedNahavandi, N.نوع مدرک
Textزبان مدرک
Englishچکیده
In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting in the line of any machine until its processing is completed on the last one. Integration of the properties of both of these environments, which is applied in many industries such as robotic industries, is not investigated separately. First, we develop a mathematical model for the problem and then we present three methods to solve it. Therefore, we construct simulated annealing (SA), genetic algorithm (GA) and a bottleneck based heuristic (BB) algorithms that solve the problem. Finally, the efficiency of the proposed methods is numerically analyzed.
کلید واژگان
wait flowshopentrant flowshop
Simulated Annealing
Genetic Algorithm
bottleneck
شماره نشریه
6تاریخ نشر
2015-06-011394-03-11
ناشر
Materials and Energy Research Centerسازمان پدید آورنده
Department of Industrial Engineering, Tarbiat Modares UniversityIndustral Engineering, Tarbiat Modares University of Tehran
School of Industrial and Systems Engineering, Tarbiat Modares University,Tehran, Iran
شاپا
1025-24951735-9244




