      A New Multi-objective Model for Multi-mode Project Planning with Risk

      (ندگان)پدیدآور
      Mollaei, H. RTavakkoli-Moghaddam, RToloie-Eshlaghy, A
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      1.370 مگابایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      The purpose of this problem is to choose a set of project activities for crashing, in a way that the expected project time, cost and risk are minimized and the expected quality is maximized. In this problem, each project activity can be performed with a specific executive mode. Each executive mode is characterized with four measures, namely the expected time, cost, quality and risk. In this paper, linear relationships between time and cost, and between time and quality are omitted and the problem of the expected time-cost-quality tradeoff is considered in a probabilistic and discrete state. Then, to make the problem more real, the combination of four measures are considered as uncertain for each executive mode. It means that time, cost, quality or risk (or all of them) of each activity in each executive mode is considered as the expected numbers (probabilistic means). After modeling three objective problems, a test problem with nine activities is presented and solved by the NSGA-II algorithm. In order to improve the results and speed of the proposed algorithm in accessing Pareto solutions, a new hybrid algorithm, called MEM-NSGA, is presented that gives better solutions than the NSGA-II algorithm in the same conditions.
      کلید واژگان
      Project scheduling
      Risk based project planning
      Discrete Time–Cost–Quality
      risk Trade
      Off
      Evolutionary Algorithm

      شماره نشریه
      5
      تاریخ نشر
      2018-05-01
      1397-02-11
      ناشر
      Materials and Energy Research Center
      سازمان پدید آورنده
      Department of Industrial Management, Science and Research Branch, Islamic Azad University, Tehran, Iran
      School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
      Department of Industrial Management, Science and Research Branch, Islamic Azad University, Tehran, Iran

      شاپا
      1025-2495
      1735-9244
      URI
      http://www.ije.ir/article_73179.html
      https://iranjournals.nlai.ir/handle/123456789/336946

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب