• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • International Journal of Engineering
      • Volume 31, Issue 3
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • International Journal of Engineering
      • Volume 31, Issue 3
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Distributed Generation Expansion Planning Considering Load Growth Uncertainty: A Novel Multi-Period Stochastic Model

      (ندگان)پدیدآور
      Hosseini mola, JBarforoshi, TAdabi Firouzjaee, J
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      1.256 مگابایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      Abstract – Distributed generation (DG) technology is known as an efficient solution for applying in distribution system planning (DSP) problems. Load growth uncertainty associated with distribution network is a significant source of uncertainty which highly affects optimal management of DGs. In order to handle this problem, a novel model is proposed in this paper based on DG solution, considering load uncertainty. This model is designed to minimize network costs including operation and losses.  Genetic algorithm is used with the purpose of finding the optimal places, sizes as well as times for DGs. Load uncertainty is also modeled through Markov tree. To illustrate the effectiveness of the proposed model, it is tested in different scenarios considering the effects of the purchased power price, DG penetration factor and DG operation intervals. These scenarios are conducted in two different phases, with and without uncertainty and the results are then compared and discussed. Moreover, by considering load uncertainty in planning, planning models would be robust against network future load variations.
      کلید واژگان
      distributed generation (DG)
      Distribution System Planning (DSP)
      Load Growth
      Genetic Algorithm
      Markov Tree
      Uncertainty

      شماره نشریه
      3
      تاریخ نشر
      2018-03-01
      1396-12-10
      ناشر
      Materials and Energy Research Center
      سازمان پدید آورنده
      HV Substations Research Group, Department of Electrical and Computer Engineering, Babol Noshirvani University of Technology, Babol, Iran
      HV Substations Research Group, Department of Electrical and Computer Engineering, Babol Noshirvani University of Technology, Babol, Iran
      HV Substations Research Group, Department of Electrical and Computer Engineering, Babol Noshirvani University of Technology, Babol, Iran

      شاپا
      1025-2495
      1735-9244
      URI
      http://www.ije.ir/article_73133.html
      https://iranjournals.nlai.ir/handle/123456789/336641

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب