• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • International Journal of Engineering
    • Volume 26, Issue 2
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • International Journal of Engineering
    • Volume 26, Issue 2
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    A New Multi-objective Job Shop Scheduling with Setup Times Using a Hybrid Genetic Algorithm

    (ندگان)پدیدآور
    emami, leilaSadegheih, A.Fakhrzad, M.B.
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    381.3کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    This paper  presents a new multi objective job shop scheduling with sequence-dependent setup times. The objectives are to minimize the makespan and sum of the earliness and tardiness of jobs in a time window. A mixed integer programming model is developed for the given problem that belongs to NP-hard class. In this case, traditional approaches cannot reach to an optimal solution in a reasonable time. Thus, we propose an efficient multi-objective hybrid genetic algorithm.we assign fitness based  dominance relation and weighted aggregate in the genetic algorithm and local search, respectively.We take a variable neighborhood search algorithm as a local improving procedure in the proposed algorithm to the best individuals in the population of GA every specific number generations. To prove the efficiency of our proposed HGA, a number of test problems are solved. Its reliability based on some comparison metrics is compared with a prominent multi-objective evolutionary algorithm, namely SPEA-II. The computational results show that the proposed HGA outperforms the SPEAII algorithm.
    کلید واژگان
    Job shop scheduling
    Sequence
    Dependent Setup Times
    Multi objective Optimization
    earliness/tardiness
    completion time
    Hybrid evolutionary algorithm

    شماره نشریه
    2
    تاریخ نشر
    2013-02-01
    1391-11-13
    ناشر
    Materials and Energy Research Center
    سازمان پدید آورنده
    Industrial Engineering, Yazd University
    IE yazd, Yazd University
    industrial engineering, Yazd University

    شاپا
    1025-2495
    1735-9244
    URI
    http://www.ije.ir/article_72088.html
    https://iranjournals.nlai.ir/handle/123456789/335810

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب