      A Fuzzy Multi Objective Programming Model for Power Generation and Transmission Expansion Planning Problem

      (ندگان)پدیدآور
      Madadi, M.Torabi, S. A.
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      198.7کیلوبایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      The increasing consumption of electricity over time forces different countries to establishnew power plants and transmission lines. There are various crisp single-objective mathematicalmodels in the literature for the long-term power generation and transmission expansion planning tohelp the decision makers to make more reasonable decisions. But, in practice, most of the parametersassociated with the input data, such as forecasted demands for electricity consumption, economic andtechnical characteristics of new evolving generating and transmission technologies are imprecise(fuzzy) in nature. Moreover, making such strategic decisions require considering several objectivessimultaneously and applying appropriate multi-objective programming approach to yield severalcompromise solutions. In this paper, we take into account these main characteristics of the problem inour proposed model. Also, the maintenance cost of generation units is modeled in such a way thathandles its increasing nature over operating periods. Consequently, we propose a new fuzzy multiobjective mixed integer linear programming model (FMOMILP) for integrated power generation andtransmission expansion planning problem. After applying the effective strategies to convert theoriginal FMOMILP into an equivalent single objective crisp one, through an illustrative example weshow that the results obtained by proposed fuzzy model is more reliable than the crisp one. Finally,some concluding remarks are also provided.
      کلید واژگان
      Generation Expansion Planning (GEP)
      Transmission Expansion Planning (TEP)
      Fuzzy Multiple Objective Linear Programming

      شماره نشریه
      1
      تاریخ نشر
      2010-01-01
      1388-10-11
      ناشر
      Materials and Energy Research Center
      سازمان پدید آورنده
      Industrial Engineering, University of Tehran
      School of Industrial Engineering, University of Tehran

      شاپا
      1025-2495
      1735-9244
      URI
      http://www.ije.ir/article_71828.html
      https://iranjournals.nlai.ir/handle/123456789/335449

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب