• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Iranian Journal of Fuzzy Systems
      • Volume 16, Issue 4
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Iranian Journal of Fuzzy Systems
      • Volume 16, Issue 4
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      A bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics

      (ندگان)پدیدآور
      Sadati, A.Tavakkoli-Moghaddam, R.Naderi, B.Mohammadi, M.
      Thumbnail
      نوع مدرک
      Text
      Research Paper
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity, in which the number of jobs assigned to each batch on the machine does not violate the machine capacity. The batch processing time, the batch ready time and the batch due date are presented by the longest processing time, the longest ready time and the shortest due date of the jobs that belong to the batch, respectively. To determine the longest and shortest time, the method suggested by Jiménez et al.cite{c18} is used for ranking the fuzzy numbers. A bi-objective fuzzy mixed-integer linear programming model is proposed and solved by two exact methods (i.e., two-phase fuzzy and $epsilon$-constraint) for small-sized problems to obtain a set of Pareto solutions. Because the problem belongs to the class NP-hard, two meta-heuristics, namely fuzzy non-dominated sorting genetic algorithm (FNSGA-II) and fuzzy multi-objective discrete teaching–learning-based optimization (FMODTLBO), are proposed. Then, the comparison of results is illustrated to show their performances. Furthermore, a new representation of the solutions is a matrix with two rows and $N$ columns (i.e., jobs) used to assign the jobs to the batches that processed on the machines.
      کلید واژگان
      Batch processing
      unrelated parallel machines scheduling
      fuzzy parameters
      fuzzy multi-objective meta-heuristics

      شماره نشریه
      4
      تاریخ نشر
      2019-08-01
      1398-05-10
      ناشر
      University of Sistan and Baluchestan
      سازمان پدید آورنده
      Department of Industrial Engineering, Science and Research Branch, Islamic Azad University,Tehran, Iran
      School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran and Arts et Mtiers ParisTech, LCFC, Metz, France
      Department of Industrial Engineering, Faculty of Engineering, Kharazmi University, Tehran, Iran
      Department of Industrial Engineering, Faculty of Engineering, Kharazmi University, Tehran, Iran

      شاپا
      1735-0654
      2676-4334
      URI
      https://dx.doi.org/10.22111/ijfs.2019.4779
      https://ijfs.usb.ac.ir/article_4779.html
      https://iranjournals.nlai.ir/handle/123456789/331065

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب