نمایش مختصر رکورد

dc.contributor.authorGhodratnama, Alien_US
dc.contributor.authorTorabi, Seyed Alien_US
dc.contributor.authorTavakkoli-Moghaddam, Razaen_US
dc.date.accessioned1399-07-09T07:51:29Zfa_IR
dc.date.accessioned2020-09-30T07:51:29Z
dc.date.available1399-07-09T07:51:29Zfa_IR
dc.date.available2020-09-30T07:51:29Z
dc.date.issued2012-12-01en_US
dc.date.issued1391-09-11fa_IR
dc.date.submitted2010-09-27en_US
dc.date.submitted1389-07-05fa_IR
dc.identifier.citationGhodratnama, Ali, Torabi, Seyed Ali, Tavakkoli-Moghaddam, Raza. (2012). CREDIBILITY-BASED FUZZY PROGRAMMING MODELS TO SOLVE THE BUDGET-CONSTRAINED FLEXIBLE FLOW LINE PROBLEM. Iranian Journal of Fuzzy Systems, 9(6), 1-29. doi: 10.22111/ijfs.2012.110en_US
dc.identifier.issn1735-0654
dc.identifier.issn2676-4334
dc.identifier.urihttps://dx.doi.org/10.22111/ijfs.2012.110
dc.identifier.urihttps://ijfs.usb.ac.ir/article_110.html
dc.identifier.urihttps://iranjournals.nlai.ir/handle/123456789/330281
dc.description.abstractThis paper addresses a new version of the exible ow line prob- <br />lem, i.e., the budget constrained one, in order to determine the required num- <br />ber of processors at each station along with the selection of the most eco- <br />nomical process routes for products. Since a number of parameters, such as <br />due dates, the amount of available budgets and the cost of opting particular <br />routes, are imprecise (fuzzy) in practice, they are treated as fuzzy variables. <br />Furthermore, to investigate the model behavior and to validate its attribute, <br />we propose three fuzzy programming models based upon credibility measure, <br />namely expected value model, chance-constrained programming model and <br />dependent chance-constrained programming model, in order to transform the <br />original mathematical model into a fuzzy environment. To solve these fuzzy <br />models, a hybrid meta-heuristic algorithm is proposed in which a genetic al- <br />gorithm is designed to compute the number of processors at each stage; and <br />a particle swarm optimization (PSO) algorithm is applied to obtain the op- <br />timal value of tardiness variables. Finally, computational results and some <br />concluding remarks are provided.en_US
dc.languageEnglish
dc.language.isoen_US
dc.publisherUniversity of Sistan and Baluchestanen_US
dc.relation.ispartofIranian Journal of Fuzzy Systemsen_US
dc.relation.isversionofhttps://dx.doi.org/10.22111/ijfs.2012.110
dc.subjectBudget-constrained exible ow linesen_US
dc.subjectCredibility-based fuzzy pro- grammingen_US
dc.subjectMeta-heuristicen_US
dc.subjectGenetic Algorithmen_US
dc.subjectParticle Swarm Optimizationen_US
dc.titleCREDIBILITY-BASED FUZZY PROGRAMMING MODELS TO SOLVE THE BUDGET-CONSTRAINED FLEXIBLE FLOW LINE PROBLEMen_US
dc.typeTexten_US
dc.typeResearch Paperen_US
dc.contributor.departmentDepartment of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iranen_US
dc.contributor.departmentDepartment of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iranen_US
dc.contributor.departmentDepartment of Industrial Engineering, College of En- gineering, University of Tehran, Tehran, Iranen_US
dc.citation.volume9
dc.citation.issue6
dc.citation.spage1
dc.citation.epage29


فایل‌های این مورد

فایل‌هااندازهقالبمشاهده

فایلی با این مورد مرتبط نشده است.

این مورد در مجموعه‌های زیر وجود دارد:

نمایش مختصر رکورد