| dc.contributor.author | Ghodratnama, Ali | en_US |
| dc.contributor.author | Torabi, Seyed Ali | en_US |
| dc.contributor.author | Tavakkoli-Moghaddam, Raza | en_US |
| dc.date.accessioned | 1399-07-09T07:51:29Z | fa_IR |
| dc.date.accessioned | 2020-09-30T07:51:29Z | |
| dc.date.available | 1399-07-09T07:51:29Z | fa_IR |
| dc.date.available | 2020-09-30T07:51:29Z | |
| dc.date.issued | 2012-12-01 | en_US |
| dc.date.issued | 1391-09-11 | fa_IR |
| dc.date.submitted | 2010-09-27 | en_US |
| dc.date.submitted | 1389-07-05 | fa_IR |
| dc.identifier.citation | Ghodratnama, Ali, Torabi, Seyed Ali, Tavakkoli-Moghaddam, Raza. (2012). CREDIBILITY-BASED FUZZY PROGRAMMING MODELS TO SOLVE THE BUDGET-CONSTRAINED FLEXIBLE FLOW LINE PROBLEM. Iranian Journal of Fuzzy Systems, 9(6), 1-29. doi: 10.22111/ijfs.2012.110 | en_US |
| dc.identifier.issn | 1735-0654 | |
| dc.identifier.issn | 2676-4334 | |
| dc.identifier.uri | https://dx.doi.org/10.22111/ijfs.2012.110 | |
| dc.identifier.uri | https://ijfs.usb.ac.ir/article_110.html | |
| dc.identifier.uri | https://iranjournals.nlai.ir/handle/123456789/330281 | |
| dc.description.abstract | This paper addresses a new version of the exible ow line prob- <br />lem, i.e., the budget constrained one, in order to determine the required num- <br />ber of processors at each station along with the selection of the most eco- <br />nomical process routes for products. Since a number of parameters, such as <br />due dates, the amount of available budgets and the cost of opting particular <br />routes, are imprecise (fuzzy) in practice, they are treated as fuzzy variables. <br />Furthermore, to investigate the model behavior and to validate its attribute, <br />we propose three fuzzy programming models based upon credibility measure, <br />namely expected value model, chance-constrained programming model and <br />dependent chance-constrained programming model, in order to transform the <br />original mathematical model into a fuzzy environment. To solve these fuzzy <br />models, a hybrid meta-heuristic algorithm is proposed in which a genetic al- <br />gorithm is designed to compute the number of processors at each stage; and <br />a particle swarm optimization (PSO) algorithm is applied to obtain the op- <br />timal value of tardiness variables. Finally, computational results and some <br />concluding remarks are provided. | en_US |
| dc.language | English | |
| dc.language.iso | en_US | |
| dc.publisher | University of Sistan and Baluchestan | en_US |
| dc.relation.ispartof | Iranian Journal of Fuzzy Systems | en_US |
| dc.relation.isversionof | https://dx.doi.org/10.22111/ijfs.2012.110 | |
| dc.subject | Budget-constrained
exible
ow lines | en_US |
| dc.subject | Credibility-based fuzzy pro-
gramming | en_US |
| dc.subject | Meta-heuristic | en_US |
| dc.subject | Genetic Algorithm | en_US |
| dc.subject | Particle Swarm Optimization | en_US |
| dc.title | CREDIBILITY-BASED FUZZY PROGRAMMING MODELS TO SOLVE THE BUDGET-CONSTRAINED FLEXIBLE FLOW LINE PROBLEM | en_US |
| dc.type | Text | en_US |
| dc.type | Research Paper | en_US |
| dc.contributor.department | Department of Industrial Engineering, College of Engineering,
University of Tehran, Tehran, Iran | en_US |
| dc.contributor.department | Department of Industrial Engineering, College of Engineering,
University of Tehran, Tehran, Iran | en_US |
| dc.contributor.department | Department of Industrial Engineering, College of En-
gineering, University of Tehran, Tehran, Iran | en_US |
| dc.citation.volume | 9 | |
| dc.citation.issue | 6 | |
| dc.citation.spage | 1 | |
| dc.citation.epage | 29 | |