• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • International Journal of Mining and Geo-Engineering
      • Volume 51, Issue 1
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • International Journal of Mining and Geo-Engineering
      • Volume 51, Issue 1
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      A genetic algorithm approach for open-pit mine production scheduling

      (ندگان)پدیدآور
      Alipour, Arefkhodaiari, Ali AsgharJafari, AhmadTavakkoli-Moghaddam, Reza
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      759.9کیلوبایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      Research Paper
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms that widely are utilized to solve NP-hard problems. Herein, GA is implemented in a hypothetical Two-Dimensional (2D) copper orebody model. The orebody is featured as two-dimensional (2D) array of blocks. Likewise, counterpart 2D GA array was used to represent the OPPS problem's solution space. Thereupon, the fitness function is defined according to the OPPS problem's objective function to assess the solution domain. Also, new normalization method was used for the handling of block sequencing constraint. A numerical study is performed to compare the solutions of the exact and GA-based methods. It is shown that the gap between GA and the optimal solution by the exact method is less than % 5; hereupon GA is found to be efficiently in solving OPPS problem.
      کلید واژگان
      Open-Pit Mine
      Production Scheduling
      metaheuristic and genetic algorithm

      شماره نشریه
      1
      تاریخ نشر
      2017-06-01
      1396-03-11
      ناشر
      University of Tehran
      سازمان پدید آورنده
      School of Mining Engineering, College of Engineering, University of Tehran, Tehran, Iran
      School of Mining Engineering, College of Engineering, University of Tehran, Tehran, Iran.
      School of Mining Engineering, College of Engineering, University of Tehran, Tehran, Iran.
      School of Industrial Engineering & Engineering Optimization Research Group, College of Engineering, University of Tehran, Tehran, Iran.

      شاپا
      2345-6930
      2345-6949
      URI
      https://dx.doi.org/10.22059/ijmge.2017.62152
      https://ijmge.ut.ac.ir/article_62152.html
      https://iranjournals.nlai.ir/handle/123456789/325089

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب