      Determination of Concession Period in Build-Operate-Transfer Projects Using Fuzzy Logic

      (ندگان)پدیدآور
      Nasirzadeh, FarnadKhanzadi, MostafaAlipour, Majid
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      381.1کیلوبایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      Research Paper
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      The build-operate-transfer (BOT) projects are a popular method of privatization of public infrastructure development. There are several risks which might affect a BOT project negatively. Concession period is one of the most important decision variables in arranging a BOT-type contract which should be determined considering the existing risks and uncertainties. A longer concession period is more beneficial to the private investor, whereas a prolonged concession period may result in loss for government investments. On the other hand, if the concession period were too short, the investor would either reject the contract offer or would be forced to increase the operation fees in order to recover the investment costs and to make a certain level of profit. In this paper, the concession period is determined using a new fuzzy logic based methodology. The proposed approach accounts for the existing risks and uncertainties. In the proposed methodology, the interests of both parties would be ensured and a win-win solution would be achieved. To evaluate the performance of the proposed methodology, the methodology was implemented in a highway project.
      کلید واژگان
      BOT
      Concession period
      Fuzzy logic
      risk management
      optimization under uncertainty
      simulation-based optimization

      شماره نشریه
      2
      تاریخ نشر
      2014-07-01
      1393-04-10
      ناشر
      University of Tehran, College of Farabi
      پردیس فارابی دانشگاه تهران
      سازمان پدید آورنده
      Assistant Professor, Dept. of Civil Eng., Faculty of Engineering, Payame Noor University, Tehran, Iran
      Assistant Professor, Dept. of Civil Eng., Iran University of Science and Technology, Tehran, Iran
      M.Sc. Student, Dept. of Civil Eng., Iran University of Science and Technology, Tehran, Iran

      شاپا
      2008-7055
      2345-3745
      URI
      https://dx.doi.org/10.22059/ijms.2014.36625
      https://ijms.ut.ac.ir/article_36625.html
      https://iranjournals.nlai.ir/handle/123456789/323918

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب