• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Iranian Journal of Management Studies
    • Volume 7, Issue 1
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Iranian Journal of Management Studies
    • Volume 7, Issue 1
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Contractor selection in MCDM context using fuzzy AHP

    (ندگان)پدیدآور
    Gholipour, RahmatollahJandaghi, GholamrezaRajaei, Reza
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    526.6کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Research Paper
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    Contractor selection is one of the most important problem in supply chain and itsstrongly effect on firm`s performance. Because a significant amount of auniversity`s budget assigns to construction contracts, contractor selection is animportant problem for the financial status of universities. Since Contractor selectionis a multi-criteria decision making problem (MCDM), lots of methods proposed toface this problem. Selection is a broad comparison of contractors using a commonset of criteria and measures. Analytic hierarchy process (AHP) and other traditionalmethods widely used for contractor and vendor selection by researches regarding tolots linguistic variables and both qualitative and quantitative criteria and to tackleambiguous nature of contractor selection problem, although there is someInsufficiency about them. In this article we use FAHP that is a fuzzy extension ofAHP to handle the fuzziness of the data involved in deciding the preferences ofdifferent decision variables. The linguistic level of comparisons produced by expertsfor each comparison is tapped in the form triangular fuzzy numbers to constructfuzzy pairwise comparison matrices. We priorities Tehran university`s constructioncontractor about each criteria and determine the best one about all of them.
    کلید واژگان
    Analytic Hierarchy Process
    Contractor selection
    fuzzy set theory
    multi-criteria decision making problem

    شماره نشریه
    1
    تاریخ نشر
    2014-01-01
    1392-10-11
    ناشر
    University of Tehran, College of Farabi
    پردیس فارابی دانشگاه تهران
    سازمان پدید آورنده
    Associate Professor, Faculty of Management, University of Tehran, Iran
    Professor, Faculty of Management Farabi Campus, University of Tehran, Iran
    PHD candidate of financial management, Pardis Farabi college, university of Tehran, Iran

    شاپا
    2008-7055
    2345-3745
    URI
    https://dx.doi.org/10.22059/ijms.2014.36206
    https://ijms.ut.ac.ir/article_36206.html
    https://iranjournals.nlai.ir/handle/123456789/323777

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب