• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Iranian Journal of Science and Technology (Sciences)
      • Volume 38, Issue 4
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Iranian Journal of Science and Technology (Sciences)
      • Volume 38, Issue 4
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Effective workflow for optimization of intelligent well completions

      (ندگان)پدیدآور
      Behrouz, T.Rasaei, M. R.Masoudi, R.
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      634.6کیلوبایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      Regular Paper
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      Intelligent wells provide the ability for monitoring and control of downhole environment of the wells. Downhole monitoring is achieved through sensors while control is realized with downhole valves. Recovery from intelligent wells can be improved by proper selection of candidate wells/fields and optimizing the number, location and performance of the installed Interval Control Valves. Design criteria, however, suffer from incomplete understanding of the precise determination of these parameters, their interaction and combined effects. Having known the candidate well, we presented a new workflow to optimize the number, location and performance of Interval Control Valves as the main element of intelligent wells. This is a very computationally demanding and time consuming task; therefore a proxy model is developed and applied to speed up the process. Primary evaluations show that optimization of each parameter independently is not the best practice because of their interrelation and combined effects on objective function. An integrated optimization approach is therefore developed in which all the Interval Control Valves' parameters are optimized together during the process. Considerable improvement in cumulative oil production and control of produced water is achieved by applying this method on real field data.
      کلید واژگان
      Intelligent well
      Optimization
      proxy model
      workflow
      interval control valve (ICV)

      شماره نشریه
      4
      تاریخ نشر
      2014-12-01
      1393-09-10
      ناشر
      Springer
      سازمان پدید آورنده
      Institute of Petroleum Engineering (IPE), School of Chemical Engineering, Faculties of Engineering, University of Tehran, Tehran, Iran
      Institute of Petroleum Engineering (IPE), School of Chemical Engineering, Faculties of Engineering, University of Tehran, Tehran, Iran
      Institute of Petroleum Engineering (IPE), School of Chemical Engineering, Faculties of Engineering, University of Tehran, Tehran, Iran

      شاپا
      1028-6276
      URI
      https://dx.doi.org/10.22099/ijsts.2014.2565
      http://ijsts.shirazu.ac.ir/article_2565.html
      https://iranjournals.nlai.ir/handle/123456789/28596

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب