• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Journal of Applied Research on Industrial Engineering
      • Volume 6, Issue 2
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Journal of Applied Research on Industrial Engineering
      • Volume 6, Issue 2
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Identification, mitigation of bottleneck by capacity addition and economic analysis for copper cable production process: a case study

      (ندگان)پدیدآور
      Shams, Aurpon TahsinHasan, Kamrul
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      722.4کیلوبایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      Research Paper
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      A bottleneck machine in a production line will reduce the productivity of the whole. The results of having a bottleneck are stalls in production, supply overstock, pressure from customers, and low employee morale. This paper focuses on the identification of the bottleneck in the production process of “Bangladesh cable silpa limited" and after the identification, tries to mitigate the bottleneck. A bottleneck machine or process causes starving or blocking of parts in the system, thus, therefore, increases the non-value added time and reduces the system performance. In this work, the bottleneck process is identified by using ARENA simulation based on the highest utilization rate and longest queue length matrices. Then, the bottleneck is reduced by increasing the capacity or the number of the machine in the bottleneck process. We can see the effect of changing the capacity of the process without changing the actual production line. Calculating it in a conventional way is very time consuming too. The last step of the thesis is to do an economic analysis. Because when the capacity of the process is increased, the production rate increases but the additional capacity increases the cost of the production.
      کلید واژگان
      bottleneck
      Capacity addition
      Arena simulation
      Cost-benefit analysis
      Manufacturing and Logistics

      شماره نشریه
      2
      تاریخ نشر
      2019-06-01
      1398-03-11
      ناشر
      Ayandegan Institute of Higher Education, Iran
      سازمان پدید آورنده
      Department of Industrial Engineering and Management, Faculty of Mechanical Engineering, Khulna University of Engineering & Technology, Khulna-9203, Bangladesh.
      Department of Industrial Engineering and Management, Faculty of Mechanical Engineering, Khulna University of Engineering & Technology, Khulna-9203, Bangladesh.

      شاپا
      2538-5100
      2676-6167
      URI
      https://dx.doi.org/10.22105/jarie.2019.182889.1088
      http://www.journal-aprie.com/article_89084.html
      https://iranjournals.nlai.ir/handle/123456789/26980

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب