    Identification, mitigation of bottleneck by capacity addition and economic analysis for copper cable production process: a case study

    (ندگان)پدیدآور
    Shams, Aurpon TahsinHasan, Kamrul
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    722.4کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Research Paper
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    A bottleneck machine in a production line will reduce the productivity of the whole. The results of having a bottleneck are stalls in production, supply overstock, pressure from customers, and low employee morale. This paper focuses on the identification of the bottleneck in the production process of “Bangladesh cable silpa limited" and after the identification, tries to mitigate the bottleneck. A bottleneck machine or process causes starving or blocking of parts in the system, thus, therefore, increases the non-value added time and reduces the system performance. In this work, the bottleneck process is identified by using ARENA simulation based on the highest utilization rate and longest queue length matrices. Then, the bottleneck is reduced by increasing the capacity or the number of the machine in the bottleneck process. We can see the effect of changing the capacity of the process without changing the actual production line. Calculating it in a conventional way is very time consuming too. The last step of the thesis is to do an economic analysis. Because when the capacity of the process is increased, the production rate increases but the additional capacity increases the cost of the production.
    کلید واژگان
    bottleneck
    Capacity addition
    Arena simulation
    Cost-benefit analysis
    Manufacturing and Logistics

    شماره نشریه
    2
    تاریخ نشر
    2019-06-01
    1398-03-11
    ناشر
    Ayandegan Institute of Higher Education, Iran
    سازمان پدید آورنده
    Department of Industrial Engineering and Management, Faculty of Mechanical Engineering, Khulna University of Engineering & Technology, Khulna-9203, Bangladesh.
    Department of Industrial Engineering and Management, Faculty of Mechanical Engineering, Khulna University of Engineering & Technology, Khulna-9203, Bangladesh.

    شاپا
    2538-5100
    2676-6167
    URI
    https://dx.doi.org/10.22105/jarie.2019.182889.1088
    http://www.journal-aprie.com/article_89084.html
    https://iranjournals.nlai.ir/handle/123456789/26980

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب