• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Advances in Industrial Engineering
      • Volume 52, Issue 1
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Advances in Industrial Engineering
      • Volume 52, Issue 1
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Two Stage Assembly Flow Shop Scheduling Problem with Aging Effect, Limit Access to Work, and Preventive Maintenance

      (ندگان)پدیدآور
      Rezghi, AdelehRezaeian, Javad
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      1.160 مگابایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      Research Paper
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      This paper studies the two-stage assembly flow shop problem (TAFSP) considering aging effects of the machines and preventive maintenance activities. At the first stage, m-1 parallel machines process parts of each jobs, and at the second stage, related parts of the jobs are assembled by one assembly machine. As the machines work on the jobs, their tools get aged. Aging effects on the machines causes that they will not be able to complete the jobs in the same time could as they were new or when they are operating jobs immediately after their preventive maintenance activity. Processing times of the job are related to the positions, in which it is located after the last preventive maintenance. The job that is operated in a position immediately after the preventive maintenance activity on a machine has its standard processing time. However, the processing time of the jobs operated in the further positions increase based on the number of the positions. The machines return to the initial condition after each preventive maintenance activity. The objective is to schedule the jobs on the machines and determine when the preventive maintenance activities get done on them in order to minimize the total weighted tardiness and maintenance costs. An integer mathematical model is presented for the problem and its validation is shown by solving an example in small scale. Since two-stage assembly flow shop problem is NP-hard, in order to solve the problem in medium and large scale two meta-heuristic algorithms, hybrid genetic algorithm (HGA) and hybrid particle swarm optimization (HPSO) are proposed. These algorithms are the hybrid version of genetic algorithm and particle swarm optimization representatively with simulated annealing. The algorithms are tuned by using Taguchi method, and are used to solve many numerical examples. Finally, the statistical analysis illustrates that the performance of HPSO is better than HGA.
      کلید واژگان
      Aging Effect
      Genetic Algorithm
      Preventive maintenance
      Simulated Annealing
      Two-Stage Assembly Flow Shop Problem
      Operation and Production Engineering

      شماره نشریه
      1
      تاریخ نشر
      2018-04-01
      1397-01-12
      ناشر
      University of Tehran
      سازمان پدید آورنده
      Department of Industrial Engineering, Mazandaran University of Science and Technology, Mazandaran, Iran
      Department of Industrial Engineering, Mazandaran University of Science and Technology, Mazandaran, Iran

      شاپا
      2423-6896
      2423-6888
      URI
      https://dx.doi.org/10.22059/jieng.2018.221166.1262
      https://jieng.ut.ac.ir/article_66290.html
      https://iranjournals.nlai.ir/handle/123456789/257633

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب