• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Advances in Industrial Engineering
    • Volume 51, Issue 4
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Advances in Industrial Engineering
    • Volume 51, Issue 4
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Modeling and Solving a Multi-product Economic Order Quantity Problem with Imperfect Items and Emergency Buy or Repair Options

    (ندگان)پدیدآور
    Amirhosseini, KhashayarMohammadi, MohammadPasandideh, Seyed Hamidreza
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    906.2کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Research Paper
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    In this paper, it has been proposed a multi-product economic order quantity (EOQ) model, assuming the presence of some imperfect items. They are inspected 100 percent as they are delivered, and defective items are withdrawn. We do not access to supplier to replace the imperfect items with perfect one. So for meeting the demand, there are two options for imperfect items: buy or repair. In buy option, we sell the imperfect items in second market with lower price, and then buy the imperfect items from local supplier with higher price; but in repair option, we will send the imperfect items to repairing workshop, and after they are delivered from repair facility, they are sold as perfect items. There are also some limitations in available budget and warehouse space, and thus we should determine the economic order quantity for each item by considering these limitations. Additional in repairing option, we have some constraints for repairing rate. In the proposed model, the shortage is not allowed, and we have considered this issue in employing alternatives. This paper extends the supposed assumes by Jaber et al. (سال؟؟؟). The Proposed problem is a Mixed Integer Non-Linear problem (MINLP). This field of problems are NP-Hard, and they are solved by Meta heuristic algorithms, but they can be solved by exact methods in small scale. So, the proposed problem in this paper is solved by exact method. We also solved numerical examples, and applied the sensitivity analysis for important parameters.
    کلید واژگان
    Economic order quantity
    Emergency buy
    Exact method
    Repair
    Logistics and Supply Chain and Inventory Control

    شماره نشریه
    4
    تاریخ نشر
    2018-01-01
    1396-10-11
    ناشر
    University of Tehran
    سازمان پدید آورنده
    Department of Industrial Engineering, Kharazmi University, Tehran, Iran
    Department of Industrial Engineering, Kharazmi University, Tehran, Iran
    Department of Industrial Engineering, Kharazmi University, Tehran, Iran

    شاپا
    2423-6896
    2423-6888
    URI
    https://dx.doi.org/10.22059/jieng.2017.221136.1261
    https://jieng.ut.ac.ir/article_65125.html
    https://iranjournals.nlai.ir/handle/123456789/257622

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب