• ورود به سامانه
      مشاهده مورد 
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Advances in Industrial Engineering
      • Volume 50, Issue 2
      • مشاهده مورد
      •   صفحهٔ اصلی
      • نشریات انگلیسی
      • Advances in Industrial Engineering
      • Volume 50, Issue 2
      • مشاهده مورد
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Simoltaneous Lot-sizing and Scheduling in Hybrid Flow Shop Production Environment with Resource Constraint

      (ندگان)پدیدآور
      Fallah Sanami, SaharRamezanian, RezaShafiei Nikabadi, Mohsen
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      659کیلوبایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      Research Paper
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      The aim of this Paper is to study a multi-product, multi-period production systems in a hybrid flow shop so that lot-sizing and scheduling will be detemined simultaneously. A new mixed-integer programming model is proposed to formulate the studied problem. The objective function in this investigation includes the total cost of production, inventory and external supply. In the case of not satisfying the demand of customers, this demand should be met by foreign suppliers with higher price. The simultaneous lot-sizing and scheduling problem are classified in strongly NP-hard class. Due to the high computational complexity of the studied problem, particle swarm optimization (PSO) and imperialist competitive algorithms (ICA) are implemented for solving the considered problem. The algorithms explore the solution space for both lot-sizing and scheduling and find a combination of production plan and sequence that is feasible and close to optimum. First, the implemented algorithms are used for solving randomly generated instances with different sizes. Then, these methods are used to solve the case of tile industry and the obtained results by two methods are compared with each other. Computational experiences show that the algorithms are able to achieve good-quality solutions for the problem in a reasonable time. Also, the results of ICA are better than PSO results for the mentioned case study.
      کلید واژگان
      Hybrid flow shop production system
      Imperialist competitive algorithm
      Machine capacity constraint
      mathematical modeling
      Particle swarm optimization
      Simultaneous lot-sizing and scheduling
      Operation and Production Engineering

      شماره نشریه
      2
      تاریخ نشر
      2016-10-01
      1395-07-10
      ناشر
      University of Tehran
      سازمان پدید آورنده
      Department of Economic and Management, Semnan University, Semnan, Iran
      Department of Industrial Engineering, K.N. Toosi University of Technology, Tehran, Iran
      Department of Economic and Management, Semnan University, Semnan, Iran

      شاپا
      2423-6896
      2423-6888
      URI
      https://dx.doi.org/10.22059/jieng.2016.60731
      https://jieng.ut.ac.ir/article_60731.html
      https://iranjournals.nlai.ir/handle/123456789/257568

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب