• ثبت نام
    • ورود به سامانه
    مشاهده مورد 
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Advances in Industrial Engineering
    • Volume 50, Issue 2
    • مشاهده مورد
    •   صفحهٔ اصلی
    • نشریات انگلیسی
    • Advances in Industrial Engineering
    • Volume 50, Issue 2
    • مشاهده مورد
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Simoltaneous Lot-sizing and Scheduling in Hybrid Flow Shop Production Environment with Resource Constraint

    (ندگان)پدیدآور
    Fallah Sanami, SaharRamezanian, RezaShafiei Nikabadi, Mohsen
    Thumbnail
    دریافت مدرک مشاهده
    FullText
    اندازه فایل: 
    659کیلوبایت
    نوع فايل (MIME): 
    PDF
    نوع مدرک
    Text
    Research Paper
    زبان مدرک
    English
    نمایش کامل رکورد
    چکیده
    The aim of this Paper is to study a multi-product, multi-period production systems in a hybrid flow shop so that lot-sizing and scheduling will be detemined simultaneously. A new mixed-integer programming model is proposed to formulate the studied problem. The objective function in this investigation includes the total cost of production, inventory and external supply. In the case of not satisfying the demand of customers, this demand should be met by foreign suppliers with higher price. The simultaneous lot-sizing and scheduling problem are classified in strongly NP-hard class. Due to the high computational complexity of the studied problem, particle swarm optimization (PSO) and imperialist competitive algorithms (ICA) are implemented for solving the considered problem. The algorithms explore the solution space for both lot-sizing and scheduling and find a combination of production plan and sequence that is feasible and close to optimum. First, the implemented algorithms are used for solving randomly generated instances with different sizes. Then, these methods are used to solve the case of tile industry and the obtained results by two methods are compared with each other. Computational experiences show that the algorithms are able to achieve good-quality solutions for the problem in a reasonable time. Also, the results of ICA are better than PSO results for the mentioned case study.
    کلید واژگان
    Hybrid flow shop production system
    Imperialist competitive algorithm
    Machine capacity constraint
    mathematical modeling
    Particle swarm optimization
    Simultaneous lot-sizing and scheduling
    Operation and Production Engineering

    شماره نشریه
    2
    تاریخ نشر
    2016-10-01
    1395-07-10
    ناشر
    University of Tehran
    سازمان پدید آورنده
    Department of Economic and Management, Semnan University, Semnan, Iran
    Department of Industrial Engineering, K.N. Toosi University of Technology, Tehran, Iran
    Department of Economic and Management, Semnan University, Semnan, Iran

    شاپا
    2423-6896
    2423-6888
    URI
    https://dx.doi.org/10.22059/jieng.2016.60731
    https://jieng.ut.ac.ir/article_60731.html
    https://iranjournals.nlai.ir/handle/123456789/257568

    مرور

    همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

    حساب من

    ورود به سامانهثبت نام

    آمار

    مشاهده آمار استفاده

    تازه ترین ها

    تازه ترین مدارک
    © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
    تماس با ما | ارسال بازخورد
    قدرت یافته توسطسیناوب