      Resource-Constrained Scheduling of Construction Projects Using the Harmony Search Algorithm

      (ندگان)پدیدآور
      gholipour, yaghobShahbazi, Mohammad Mehdi
      Thumbnail
      دریافت مدرک مشاهده
      FullText
      اندازه فایل: 
      181.3کیلوبایت
      نوع فايل (MIME): 
      PDF
      نوع مدرک
      Text
      زبان مدرک
      English
      نمایش کامل رکورد
      چکیده
      During the implementation, construction projects usually encounter situation that considerably affects the project scheduling and cost. This study aims at using an improved version of the harmony search algorithm (HSA) to schedule resource constrained construction projects. This model is formulated as a global optimization problem. It will determine the duration of each activity to minimize the project total cost. The algorithm tries to find the best duration for each activity so that it leads to the total consumption of the corresponding resource. This may cause some activities to start simultaneously. The improvements have been made to increase the convergence rate and to lower the cost and shorten duration of the project. A numerical example has been proposed to evaluate the efficacy of the algorithm. This algorithm also addresses issues such as multi-resource, resource combination, and resource limit. Two scenarios have been considered for the test problem. The former scenario shows the project scheduled using the minimum duration list and the latter scenario schedules the project using the optimization algorithm. A comparison between the two scenarios shows the effectiveness of the proposed algorithm in decreasing the total cost and duration of the projects.
      کلید واژگان
      Cash flow management
      Construction projects
      Project cost flow optimization
      Project scheduling

      تاریخ نشر
      2011-12-01
      1390-09-10
      ناشر
      University of Tehran

      شاپا
      2423-6896
      2423-6888
      URI
      https://jieng.ut.ac.ir/article_23325.html
      https://iranjournals.nlai.ir/handle/123456789/257482

      مرور

      همه جای سامانهپایگاه‌ها و مجموعه‌ها بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌هااین مجموعه بر اساس تاریخ انتشارپدیدآورانعناوینموضوع‌‌ها

      حساب من

      ورود به سامانهثبت نام

      تازه ترین ها

      تازه ترین مدارک
      © کليه حقوق اين سامانه برای سازمان اسناد و کتابخانه ملی ایران محفوظ است
      تماس با ما | ارسال بازخورد
      قدرت یافته توسطسیناوب